2,990
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0357 #10 Y:2013 | 10 | 2013 | Keep doors and windows shut when not on use | $38 | $110 | |
| LE0357 #09 Y:2013 | 09 | 2013 | Optimize plant power factor | $20,522 | $42,000 | |
| LE0357 #08 Y:2013 | 08 | 2013 | Repair and eliminate steam leaks | $1,285 | $4,500 | |
| LE0357 #07 Y:2013 | 07 | 2013 | Replace existing hvac unit with high efficiency model | $4,733 | $11,400 | |
| LE0357 #06 Y:2013 | 06 | 2013 | Utilize higher efficiency lamps and/or ballasts | $5,062 | $3,910 | |
| LE0357 #05 Y:2013 | 05 | 2013 | Reduce the pressure of compressed air to the minimum required | $29,839 | - | |
| LE0357 #04 Y:2013 | 04 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $143,805 | $5,420 | |
| LE0357 #03 Y:2013 | 03 | 2013 | Install timers and/or thermostats | $992 | $225 | |
| LE0357 #02 Y:2013 | 02 | 2013 | Preheat combustion air with waste heat | $41,310 | $87,100 | |
| LE0357 #01 Y:2013 | 01 | 2013 | Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $990,391 | $2,480,000 | |
| BS0016 #06 Y:2013 | 06 | 2013 | Install vinyl strip / high speed / air curtain doors | $2,648 | $1,185 | |
| BS0016 #05 Y:2013 | 05 | 2013 | Install vinyl strip / high speed / air curtain doors | $1,127 | $6,826 | |
| BS0016 #04 Y:2013 | 04 | 2013 | Cover open tanks | $4,197 | $1,600 | |
| BS0016 #03 Y:2013 | 03 | 2013 | Insulate bare equipment | $437 | $604 | |
| BS0016 #02 Y:2013 | 02 | 2013 | Install compressor air intakes in coolest locations | $571 | $184 | |
| BS0016 #01 Y:2013 | 01 | 2013 | Upgrade controls on compressors | $15,856 | $27,630 | |
| SF0424 #09 Y:2012 | 09 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $6,508 | $26,000 | |
| SF0424 #08 Y:2012 | 08 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $1,020 | $4,007 | |
| SF0424 #07 Y:2012 | 07 | 2012 | Utilize higher efficiency lamps and/or ballasts | $79,423 | $291,716 | |
| SF0424 #06 Y:2012 | 06 | 2012 | Install occupancy sensors | $7,962 | $46,705 |