ITAC Assessment: BS0016
ITAC logo
ITAC Assessment: BS0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Salad Dressing
NAICS 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 61,045
ft2
Annual Production 4,160
Tgal
Production Hrs. Annual 4,108
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,033 1,892,357
kWh
Electricity Demand $17,147 3,290
kW-mo/yr
Natural Gas $8,946 1,051
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $15,856 $27,630 $15,856
264,265
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $571 $184 $571
9,520
kWh
-
03 2.2511: Insulate bare equipment $437 $604 $437
7,285
kWh
-
04 2.2514: Cover open tanks $4,197 $1,600 - $4,197
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,127 $6,826 $1,127
18,780
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,648 $1,185 - $2,648
-
MMBtu
TOTAL RECOMMENDED $24,836 $38,029 $17,991
299,850
kWh
$6,845
-
MMBtu
TOTAL IMPLEMENTED $21,061 $30,018 $16,864
281,070
kWh
$4,197
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs