ITAC Assessment: WV0336
ITAC logo
ITAC Assessment: WV0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Blow Molded Plastics
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 112,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 8,565
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $553,227 9,540,000
kWh
Electricity Demand $141,801 16,536
kW-mo/yr
Electricity Fees $880 -
Natural Gas $2,510 207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,141 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,594 $14,968 $13,745
237,040
kWh
$2,849
-
kW-mo/yr
- -
02 2.4113: Install motor voltage controller on lightly loaded motors $14,092 $25,000 $11,672
201,157
kWh
$2,420
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,454 $1,333 $7,832
134,994
kWh
$1,622
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,755 - $6,424
110,754
kWh
$1,331
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,345 - $5,256
90,649
kWh
$1,089
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $3,097 $510 $2,565
44,243
kWh
$532
-
kW-mo/yr
- -
07 2.4151: Develop a repair/replace policy $2,688 $231 $2,579
44,536
kWh
$529
-
kW-mo/yr
$(-420.0) -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $796 $189 $659
11,364
kWh
$137
-
kW-mo/yr
- -
09 2.2628: Utilize a less expensive cooling method $320 - $1,019
17,580
kWh
$211
-
kW-mo/yr
$(-35.0) $(-875.0)
TOTAL RECOMMENDED $61,141 $42,231 $51,751
892,317
kWh
$10,720
-
kW-mo/yr
$(-455.0) $(-875.0)
TOTAL IMPLEMENTED $43,632 $16,721 $36,495
629,337
kWh
$7,557
-
kW-mo/yr
$(-420.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs