Assessment Year | 2006 |
---|---|
Principal Product | Blow Molded Plastics |
NAICS | 337215: Showcase, Partition, Shelving, and Locker Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
112,000
ft2
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 8,565
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $553,227 | 9,540,000 |
kWh
|
$0.058 |
Electricity Demand | $141,801 | 16,536 |
kW-mo/yr
|
$8.58 |
Electricity Fees | $880 | - |
|
- |
Natural Gas | $2,510 | 207 |
MMBtu
|
$12.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,141 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,632 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,594 | $14,968 |
$13,745
237,040
kWh
|
$2,849
-
kW-mo/yr
|
- | - | |
02 | 2.4113: Install motor voltage controller on lightly loaded motors | $14,092 | $25,000 |
$11,672
201,157
kWh
|
$2,420
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,454 | $1,333 |
$7,832
134,994
kWh
|
$1,622
-
kW-mo/yr
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,755 | - |
$6,424
110,754
kWh
|
$1,331
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,345 | - |
$5,256
90,649
kWh
|
$1,089
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,097 | $510 |
$2,565
44,243
kWh
|
$532
-
kW-mo/yr
|
- | - | |
07 | 2.4151: Develop a repair/replace policy | $2,688 | $231 |
$2,579
44,536
kWh
|
$529
-
kW-mo/yr
|
$(-420.0) | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $796 | $189 |
$659
11,364
kWh
|
$137
-
kW-mo/yr
|
- | - | |
09 | 2.2628: Utilize a less expensive cooling method | $320 | - |
$1,019
17,580
kWh
|
$211
-
kW-mo/yr
|
$(-35.0) | $(-875.0) | |
TOTAL RECOMMENDED | $61,141 | $42,231 |
$51,751
892,317
kWh
|
$10,720
-
kW-mo/yr
|
$(-455.0) | $(-875.0) | ||
TOTAL IMPLEMENTED | $43,632 | $16,721 |
$36,495
629,337
kWh
|
$7,557
-
kW-mo/yr
|
$(-420.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs