Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,990

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Canned, frozen, and preserved fruits, vegetables, and food specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0655 #07 Y:2015 Modify refrigeration system to operate at a lower pressure $51,916 $126,000
OR0655 #06 Y:2015 Add equipment/ operators to reduce production bottleneck $180,695 $251,760
OR0655 #05 Y:2015 Flash condensate to produce lower pressure steam $15,571 $19,050
OR0655 #04 Y:2015 Adjust / maintain fork lift trucks for most efficient operation $175,008 $188,400
OR0655 #03 Y:2015 Turn off equipment when not in use $20,211 $1,000
OR0655 #02 Y:2015 Analyze flue gas for proper air/fuel ratio $4,161 $1,000
OR0655 #01 Y:2015 Modify refrigeration system to operate at a lower pressure $26,151 -
OR0653 #06 Y:2015 Reduce the pressure of compressed air to the minimum required $1,625 $1,000
OR0653 #05 Y:2015 Modify refrigeration system to operate at a lower pressure $4,262 $15,398
OR0653 #04 Y:2015 Utilize controls to operate equipment only when needed $611 $1,058
OR0653 #03 Y:2015 Use optimum thickness insulation $3,897 $4,580
OR0653 #02 Y:2015 Flash condensate to produce lower pressure steam $36,536 $30,728
OR0653 #01 Y:2015 Increase amount of condensate returned $118,419 $40,792
TT0160 #10 Y:2015 Establish a predictive maintenance program $527 $1,176
TT0160 #09 Y:2015 Increase amount of condensate returned $1,335 $2,000
TT0160 #08 Y:2015 Lower temperature during the winter season and vice-versa $2,322 -
TT0160 #07 Y:2015 Turn off equipment during breaks, reduce operating time $4,882 -
TT0160 #06 Y:2015 Install occupancy sensors $8,554 $14,129
TT0160 #05 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $3,397 $10,000
TT0160 #04 Y:2015 Substitute compressed air cooling with water or air cooling $10,534 $21,195