Assessment Year | 2015 |
---|---|
Principal Product | Soup |
NAICS | 311991: Perishable Prepared Food Manufacturing |
SIC | 2032: Canned Specialties |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
220,000
ft2
|
Annual Production | 72,000,000
units
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $910,245 | 13,658,400 |
kWh
|
$0.067 |
Electricity Demand | $118,711 | 27,607 |
kW-mo/yr
|
$4.30 |
Electricity Fees | $425,415 | - |
|
- |
Natural Gas | $449,521 | 85,552 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $481,151 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,161 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $26,151 | - |
$26,151
393,362
kWh
|
- | - | - | - | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,161 | $1,000 | - | - |
$4,161
-
MMBtu
|
- | - | - | |
03 | 2.6218: Turn off equipment when not in use | $20,211 | $1,000 |
$20,211
304,018
kWh
|
- | - | - | - | - | |
04 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $175,008 | $188,400 |
$(-26,592.0)
(-400,000)
kWh
|
- | - | $93,600 | - | $108,000 | |
05 | 2.2127: Flash condensate to produce lower pressure steam | $15,571 | $19,050 | - | - |
$15,571
-
MMBtu
|
- | - | - | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $180,695 | $251,760 | - | - | - | - | $180,695 | - | |
07 | 2.2621: Modify refrigeration system to operate at a lower pressure | $51,916 | $126,000 |
$45,099
678,378
kWh
|
$6,817
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.2437: Recover waste heat from equipment | $4,958 | $7,816 | - | - |
$4,958
-
MMBtu
|
- | - | - | |
09 | 2.9114: Use solar heat to make electricty | $2,480 | $20,979 |
$2,462
37,041
kWh
|
$18
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $481,151 | $616,005 |
$67,331
1,012,799
kWh
|
$6,835
-
kW-mo/yr
|
$24,690
-
MMBtu
|
$93,600 | $180,695 | $108,000 | ||
TOTAL IMPLEMENTED | $4,161 | $1,000 | - | - |
$4,161
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs