ITAC Assessment: OR0655
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Soup
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2032: Canned Specialties
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 220,000
ft2
Annual Production 72,000,000
units
Production Hrs. Annual 5,200
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $910,245 13,658,400
kWh
Electricity Demand $118,711 27,607
kW-mo/yr
Electricity Fees $425,415 -
Natural Gas $449,521 85,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $481,151 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,161

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $26,151 - $26,151
393,362
kWh
- - - - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,161 $1,000 - - $4,161
-
MMBtu
- - -
03 2.6218: Turn off equipment when not in use $20,211 $1,000 $20,211
304,018
kWh
- - - - -
04 2.8227: Adjust / maintain fork lift trucks for most efficient operation $175,008 $188,400 $(-26,592.0)
(-400,000)
kWh
- - $93,600 - $108,000
05 2.2127: Flash condensate to produce lower pressure steam $15,571 $19,050 - - $15,571
-
MMBtu
- - -
06 4.111: Add equipment/ operators to reduce production bottleneck $180,695 $251,760 - - - - $180,695 -
07 2.2621: Modify refrigeration system to operate at a lower pressure $51,916 $126,000 $45,099
678,378
kWh
$6,817
-
kW-mo/yr
- - - -
08 2.2437: Recover waste heat from equipment $4,958 $7,816 - - $4,958
-
MMBtu
- - -
09 2.9114: Use solar heat to make electricty $2,480 $20,979 $2,462
37,041
kWh
$18
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $481,151 $616,005 $67,331
1,012,799
kWh
$6,835
-
kW-mo/yr
$24,690
-
MMBtu
$93,600 $180,695 $108,000
TOTAL IMPLEMENTED $4,161 $1,000 - - $4,161
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs