ITAC Assessment: MI0422
ITAC logo
ITAC Assessment: MI0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area 70,000
ft2
Annual Production 40,729,202
units
Production Hrs. Annual 3,120
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $505,618 9,678,413
kWh
Electricity Demand $235,119 24,224
kW-mo/yr
Electricity Fees $80,620 -
TOTAL YEARLY COSTS $821,357
RECOMMENDED SAVINGS* $175,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $109,428 $738,652 $44,204
850,079
kWh
$65,224
-
kW-mo/yr
02 2.4224: Upgrade controls on compressors $37,264 $20,375 $27,422
527,346
kWh
$9,842
-
kW-mo/yr
03 2.7221: Lower temperature during the winter season and vice-versa $21,293 $580 $13,111
252,132
kWh
$8,182
-
kW-mo/yr
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,309 $280 $3,115
59,904
kWh
$1,194
-
kW-mo/yr
05 2.7425: Clean or color roof to reduce solar load $2,579 $4,001 $1,900
36,537
kWh
$679
-
kW-mo/yr
06 2.6218: Turn off equipment when not in use $394 - $394
7,586
kWh
-
TOTAL RECOMMENDED $175,267 $763,888 $90,146
1,733,584
kWh
$85,121
-
kW-mo/yr
TOTAL IMPLEMENTED $28,575 $4,861 $18,520
356,159
kWh
$10,055
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs