ITAC Assessment: LL0204
ITAC logo
ITAC Assessment: LL0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Candy
NAICS 311352: Confectionery Manufacturing from Purchased Chocolate
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 269,150
ft2
Annual Production 25,500,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $494,634 7,516,060
kWh
Electricity Demand $36,534 13,757
kW-mo/yr
Electricity Fees $20,329 -
Natural Gas $209,387 23,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $162,167

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,973 $20,331 $20,603
300,853
kWh
$1,370
-
kW-mo/yr
- - - - -
02 2.7135: Install occupancy sensors $6,514 $360 $6,276
85,367
kWh
- $238 - - - -
03 2.2135: Repair and eliminate steam leaks $6,025 $3,880 - - - $6,025
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,085 $680 $2,972
45,156
kWh
- $113 - - - -
05 2.4235: Remove or close off unneeded compressed air lines $2,710 $1,350 $2,611
39,682
kWh
- $99 - - - -
06 2.7132: Install timers on light switches in little used areas $2,273 $45 $2,190
33,270
kWh
- $83 - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,897 $30 $1,828
27,770
kWh
- $69 - - - -
08 2.7111: Reduce illumination to minimum necessary levels $1,728 $90 $1,577
23,967
kWh
$88
-
kW-mo/yr
$63 - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,123 $1,400 $876
13,315
kWh
- $33 - $1,214 - -
10 2.7134: Use photocell controls $278 $28 $268
4,071
kWh
- $10 - - - -
11 4.611: Begin a practice of predictive / preventative maintenance $106,500 $5,180 - - - - - $2,500 $104,000
12 4.611: Begin a practice of predictive / preventative maintenance $11,190 $6,417 - - - - $11,190 - -
TOTAL RECOMMENDED $166,296 $39,791 $39,201
573,451
kWh
$1,458
-
kW-mo/yr
$708 $6,025
-
MMBtu
$12,404 $2,500 $104,000
TOTAL IMPLEMENTED $162,167 $38,273 $36,480
532,098
kWh
$1,370
-
kW-mo/yr
$602 $6,025
-
MMBtu
$11,190 $2,500 $104,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs