Assessment Year | 1995 |
---|---|
Principal Product | Fluid Milk, Ice Cream |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
500,000
ft2
|
Annual Production | 156,000,000
lb
|
Production Hrs. Annual | 5,980
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $170,273 | 3,680,832 |
kWh
|
$0.046 |
Natural Gas | $104,399 | 33,764 |
MMBtu
|
$3.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,531 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,188 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $1,563 | - |
$1,305
36,049
kWh
|
- | - | - | $258 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,688 | $4,179 |
$1,558
34,877
kWh
|
- | - | - | $130 | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,209 | $3,511 |
$1,209
26,964
kWh
|
- | - | - | - | - | |
04 | 2.3212: Optimize plant power factor | $1,080 | $3,600 |
$1,080
-
kWh
|
- | - | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,071 | - |
$8,071
223,623
kWh
|
- | - | - | - | - | |
06 | 3.3126: Use absorption, extraction to remove contaminants | $104,000 | $250,000 | - | - | - |
$104,000
-
gal
|
- | - | |
07 | 3.4151: Minimize water usage | $5,927 | $1,153 | - |
$2,365
-
MMBtu
|
$1,781
-
Tgal
|
- | - |
$1,781
-
Tgal
|
|
08 | 3.4151: Minimize water usage | $3,418 | $148 | - | - |
$1,709
-
Tgal
|
- | - |
$1,709
-
Tgal
|
|
09 | 3.4151: Minimize water usage | $3,344 | $600 | - | - |
$1,672
-
Tgal
|
- | - |
$1,672
-
Tgal
|
|
10 | 3.4111: Use closed cycle process to minimize waste water production | $1,952 | $489 |
$(-48.0)
(-879)
kWh
|
- |
$1,000
-
Tgal
|
- | - |
$1,000
-
Tgal
|
|
11 | 3.4151: Minimize water usage | $1,279 | $434 |
$(-55.0)
-
kWh
|
- |
$667
-
Tgal
|
- | - |
$667
-
Tgal
|
|
TOTAL RECOMMENDED | $133,531 | $264,114 |
$13,120
320,634
kWh
|
$2,365
-
MMBtu
|
$6,829
-
Tgal
|
$104,000
-
gal
|
$388 |
$6,829
-
Tgal
|
||
TOTAL IMPLEMENTED | $20,188 | $4,812 |
$10,585
286,636
kWh
|
$2,365
-
MMBtu
|
$3,490
-
Tgal
|
- | $258 |
$3,490
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs