ITAC Assessment: TT0160
ITAC logo
ITAC Assessment: TT0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Fruit Jelly
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 129,402
ft2
Annual Production 200,000,000
lb
Production Hrs. Annual 2,496
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,630 5,269,360
kWh
Electricity Demand $115,822 10,729
kW-mo/yr
Natural Gas $261,692 30,564
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,995

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.2414: Use waste heat from hot flue gases to preheat $112,350 $2,000 - - - $112,350
-
MMBtu
-
02 2.8114: Change rate schedules or other changes in utility service $25,461 $298 - - $25,461 - -
03 2.2135: Repair and eliminate steam leaks $13,910 $100 - - - $13,910
-
MMBtu
-
04 2.4237: Substitute compressed air cooling with water or air cooling $10,534 $21,195 $(-171.1)
(-2,593)
kWh
$(-179.0)
-
kW-mo/yr
- - $10,884
-
gal
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,397 $10,000 $3,397
51,466
kWh
- - - -
06 2.7135: Install occupancy sensors $8,554 $14,129 $8,554
129,503
kWh
- - - -
07 2.6212: Turn off equipment during breaks, reduce operating time $4,882 - $4,882
73,972
kWh
- - - -
08 2.7221: Lower temperature during the winter season and vice-versa $2,322 - $1,176
17,817
kWh
- - $1,146
-
MMBtu
-
09 2.2121: Increase amount of condensate returned $1,335 $2,000 - - - $1,335
-
MMBtu
-
10 2.4157: Establish a predictive maintenance program $527 $1,176 $270
4,088
kWh
$257
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $183,272 $50,898 $18,108
274,253
kWh
$78
-
kW-mo/yr
$25,461 $128,741
-
MMBtu
$10,884
-
gal
TOTAL IMPLEMENTED $35,995 $21,493 $(-171.1)
(-2,593)
kWh
$(-179.0)
-
kW-mo/yr
$25,461 - $10,884
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs