Assessment Year | 2015 |
---|---|
Principal Product | Fruit Jelly |
NAICS | 311421: Fruit and Vegetable Canning |
SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
129,402
ft2
|
Annual Production | 200,000,000
lb
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $347,630 | 5,269,360 |
kWh
|
$0.066 |
Electricity Demand | $115,822 | 10,729 |
kW-mo/yr
|
$10.80 |
Natural Gas | $261,692 | 30,564 |
MMBtu
|
$8.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $183,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,995 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $112,350 | $2,000 | - | - | - |
$112,350
-
MMBtu
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $25,461 | $298 | - | - | $25,461 | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $13,910 | $100 | - | - | - |
$13,910
-
MMBtu
|
- | |
04 | 2.4237: Substitute compressed air cooling with water or air cooling | $10,534 | $21,195 |
$(-171.1)
(-2,593)
kWh
|
$(-179.0)
-
kW-mo/yr
|
- | - |
$10,884
-
gal
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,397 | $10,000 |
$3,397
51,466
kWh
|
- | - | - | - | |
06 | 2.7135: Install occupancy sensors | $8,554 | $14,129 |
$8,554
129,503
kWh
|
- | - | - | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,882 | - |
$4,882
73,972
kWh
|
- | - | - | - | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $2,322 | - |
$1,176
17,817
kWh
|
- | - |
$1,146
-
MMBtu
|
- | |
09 | 2.2121: Increase amount of condensate returned | $1,335 | $2,000 | - | - | - |
$1,335
-
MMBtu
|
- | |
10 | 2.4157: Establish a predictive maintenance program | $527 | $1,176 |
$270
4,088
kWh
|
$257
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $183,272 | $50,898 |
$18,108
274,253
kWh
|
$78
-
kW-mo/yr
|
$25,461 |
$128,741
-
MMBtu
|
$10,884
-
gal
|
||
TOTAL IMPLEMENTED | $35,995 | $21,493 |
$(-171.1)
(-2,593)
kWh
|
$(-179.0)
-
kW-mo/yr
|
$25,461 | - |
$10,884
-
gal
|
||