ITAC Assessment: SU0436
ITAC logo
ITAC Assessment: SU0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Contract Machine Shop
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 41,764
ft2
Annual Production 390,363
units
Production Hrs. Annual 7,248
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,900 1,279,350
kWh
Electricity Demand $57,693 1,998
kW-mo/yr
Electricity Fees $4,904 -
LPG $16,646 954
MMBtu
Fuel Oil #2 $4,603 337
MMBtu
TOTAL YEARLY COSTS $161,746
RECOMMENDED SAVINGS* $20,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,622

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $95 - $26
426
kWh
$69
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,538 $388 $4,538
74,391
kWh
- - - -
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $3,447 $2,277 $3,447
56,513
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $800 $741 $283
4,643
kWh
$185
-
kW-mo/yr
- $226 $106
05 3.1161: Eliminate/reduce an operation $4,066 $4,830 $(-15.0)
(-253)
kWh
$(-693.0)
-
kW-mo/yr
- $3,623 $1,151
06 2.7447: Install vinyl strip / high speed / air curtain doors $5,893 $8,240 $(-783.0)
(-12,830)
kWh
$(-2,033.0)
-
kW-mo/yr
$8,709
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $486 $719 $243
3,985
kWh
$191
-
kW-mo/yr
- $48 $4
08 2.6211: Conserve energy by efficient use of vending machines $214 $533 $214
3,504
kWh
- - - -
09 2.4221: Install compressor air intakes in coolest locations $1,214 $3,195 $1,214
19,903
kWh
- - - -
TOTAL RECOMMENDED $20,753 $20,923 $9,167
150,282
kWh
$(-2,281.0)
-
kW-mo/yr
$8,709
-
MMBtu
$3,897 $1,261
TOTAL IMPLEMENTED $9,622 $11,043 $4,955
81,232
kWh
$(-439.0)
-
kW-mo/yr
- $3,849 $1,257
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs