ITAC Assessment: SD0528
ITAC logo
ITAC Assessment: SD0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Major Aircraft Components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 250,000
ft2
Annual Production 8,000
pieces
Production Hrs. Annual 5,625
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,590 4,580,660
kWh
Electricity Demand $241,792 11,625
kW-mo/yr
Electricity Fees $107,964 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $203,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,279

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $117,397 $321,940 $65,109
915,734
kWh
$52,288
-
kW-mo/yr
-
02 3.1192: Reduce scrap production $22,801 $25,619 $13,088
184,084
kWh
$9,713
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,641 $1,700 $13,317
187,282
kWh
$5,324
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,638 $43,142 $8,038
113,050
kWh
$7,039
-
kW-mo/yr
$561
05 2.7261: Install timers and/or thermostats $8,651 $1,032 $8,651
121,680
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $6,000 $200 $6,000
84,389
kWh
- -
07 2.4239: Eliminate or reduce compressed air usage $5,400 $1,300 $1,136
15,979
kWh
$4,264
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $4,725 $7,800 $4,725
66,833
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,286 $4,076 $1,614
22,705
kWh
$672
-
kW-mo/yr
-
10 2.2628: Utilize a less expensive cooling method $1,512 $200 $1,079
15,181
kWh
$433
-
kW-mo/yr
-
11 2.7134: Use photocell controls $157 $185 $120
1,682
kWh
$37
-
kW-mo/yr
-
TOTAL RECOMMENDED $203,208 $407,194 $122,877
1,728,599
kWh
$79,770
-
kW-mo/yr
$561
TOTAL IMPLEMENTED $34,279 $44,842 $21,355
300,332
kWh
$12,363
-
kW-mo/yr
$561
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs