Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

210

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dairy products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0507 #11 Y:2006 Modify refrigeration system to operate at a lower pressure $1,800 $2,600
OR0507 #10 Y:2006 Install isolation transformer on adjustable frequency drive $22,760 $24,900
OR0507 #09 Y:2006 Install occupancy sensors $2,100 $2,100
OR0507 #08 Y:2006 Replace city water with recycled water via cooling tower $32,400 $23,200
OR0507 #07 Y:2006 Insulate bare equipment $1,600 $1,200
OR0507 #06 Y:2006 Add additional production shift $60,100 $41,100
OR0507 #05 Y:2006 Replace existing equipment with more suitable substitutes $40,000 $1,500
OR0507 #04 Y:2006 Keep boiler tubes clean $13,700 $4,000
OR0507 #03 Y:2006 Use steam condensate for hot water supply (non-potable) $13,600 $3,200
OR0507 #02 Y:2006 Begin a practice of predictive / preventative maintenance $46,800 $2,000
OR0507 #01 Y:2006 Modify refrigeration system to operate at a lower pressure $2,600 -
OR0501 #07 Y:2006 Reduce the pressure of compressed air to the minimum required $4,100 -
OR0501 #06 Y:2006 Install occupancy sensors $8,560 $100
OR0501 #05 Y:2006 Shut off cooling if cold outside air will cool process $25,000 $3,400
OR0501 #04 Y:2006 Establish burner maintenance schedule for boilers $31,700 $105
OR0501 #03 Y:2006 Utilize energy-efficient belts and other improved mechanisms $41,300 $59,700
OR0501 #02 Y:2006 Replace fossil fuel equipment with electrical equipment $72,600 $1
OR0501 #01 Y:2006 Increase amount of condensate returned $119,000 $200
OR0479 #05 Y:2004 Modify refrigeration system to operate at a lower pressure $700 -
OR0479 #04 Y:2004 Modify refrigeration system to operate at a lower pressure $1,500 -