Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

789

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Meat packing plants
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0899 #06 Y:2013 Modify refrigeration system to operate at a lower pressure $1,303 -
UD0899 #05 Y:2013 Use excess cold process fluid for industrial cooling needs $2,075 -
UD0899 #04 Y:2013 Modify refrigeration system to operate at a lower pressure $4,795 $4,550
UD0899 #03 Y:2013 Analyze flue gas for proper air/fuel ratio $85 -
UD0899 #02 Y:2013 Reduce the pressure of compressed air to the minimum required $388 -
UD0899 #01 Y:2013 Reduce space conditioning during non-working hours $1,057 -
CO0678 #06 Y:2013 Apply for tax-free status for energy purchases $8,240 $1,500
CO0678 #05 Y:2013 Utilize higher efficiency lamps and/or ballasts $13,580 $15,680
CO0678 #04 Y:2013 Install / repair insulation on steam lines $890 $350
CO0678 #03 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $2,340 $8,100
CO0678 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $2,540 $200
CO0678 #01 Y:2013 Utilize an evaporative air pre-cooler or other heat exchanger in ac system $6,330 $14,900
UD0884 #12 Y:2013 Modify refrigeration system to operate at a lower pressure $1,101 -
UD0884 #11 Y:2013 Avoid frost formation on evaporators $1,417 -
UD0884 #10 Y:2013 Utilize controls to operate equipment only when needed $2,365 $11,824
UD0884 #09 Y:2013 Modify refrigeration system to operate at a lower pressure $2,533 $2,000
UD0884 #08 Y:2013 Utilize a less expensive cooling method $8,876 -
UD0884 #07 Y:2013 Reduce space conditioning during non-working hours $7,470 -
UD0884 #06 Y:2013 Analyze flue gas for proper air/fuel ratio $6,058 $500
UD0884 #05 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $936 $500