ITAC Assessment: UD0884
ITAC logo
ITAC Assessment: UD0884
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Frozen Hamburgers and Cheeseburgers
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 65,000
ft2
Annual Production 20,600,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $295,309 6,914,400
kWh
Electricity Demand $167,093 13,988
kW-mo/yr
Electricity Fees $2,603 -
Natural Gas $118,081 18,278
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,045

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $9,148 $1,000 - - $9,148 - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,605 $19,350 $2,614
61,200
kWh
$1,586
-
kW-mo/yr
- - $405 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,136 $7,000 $1,424
33,348
kWh
$544
-
kW-mo/yr
- - $168 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $11,400 $19,000 $9,740
228,057
kWh
$1,660
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $936 $500 $1,085
25,397
kWh
$451
-
kW-mo/yr
- - - $(-600.0)
06 2.1233: Analyze flue gas for proper air/fuel ratio $6,058 $500 - - - $6,058
-
MMBtu
- -
07 2.7224: Reduce space conditioning during non-working hours $7,470 - $1,094
25,625
kWh
- - $6,376
-
MMBtu
- -
08 2.2628: Utilize a less expensive cooling method $8,876 - $8,876
207,831
kWh
- - - - -
09 2.2621: Modify refrigeration system to operate at a lower pressure $2,533 $2,000 $2,533
59,296
kWh
- - - - -
10 2.6231: Utilize controls to operate equipment only when needed $2,365 $11,824 $2,365
55,370
kWh
- - - - -
11 2.2626: Avoid frost formation on evaporators $1,417 - $1,417
33,178
kWh
- - - - -
12 2.2621: Modify refrigeration system to operate at a lower pressure $1,101 - $1,101
25,772
kWh
- - - - -
TOTAL RECOMMENDED $58,045 $61,174 $32,249
755,074
kWh
$4,241
-
kW-mo/yr
$9,148 $12,434
-
MMBtu
$573 $(-600.0)
TOTAL IMPLEMENTED $58,045 $61,174 $32,249
755,074
kWh
$4,241
-
kW-mo/yr
$9,148 $12,434
-
MMBtu
$573 $(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs