ITAC Assessment: UD0899
ITAC logo
ITAC Assessment: UD0899
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product meat products
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 34,119
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 4,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,180 2,356,920
kWh
Electricity Demand $30,033 5,196
kW-mo/yr
Electricity Fees $32,115 -
Natural Gas $14,294 2,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,735

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $1,057 - $1,057
14,712
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $388 - $312
4,347
kWh
$76
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $85 - - - $85
-
MMBtu
-
04 2.2621: Modify refrigeration system to operate at a lower pressure $4,795 $4,550 $4,795
66,714
kWh
- - -
05 2.2696: Use excess cold process fluid for industrial cooling needs $2,075 - $2,075
28,872
kWh
- - -
06 2.2621: Modify refrigeration system to operate at a lower pressure $1,303 - $1,303
18,137
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,350 $7,126 $8,347
116,138
kWh
$1,003
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $969 $2,127 $873
12,149
kWh
$96
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,254 $15,180 $6,574
91,476
kWh
$1,373
-
kW-mo/yr
- $(-2,693.0)
10 2.7142: Utilize higher efficiency lamps and/or ballasts $3,255 $5,850 $2,394
33,306
kWh
$876
-
kW-mo/yr
- $(-15.0)
11 2.7142: Utilize higher efficiency lamps and/or ballasts $2,635 $3,920 $2,231
31,046
kWh
$466
-
kW-mo/yr
- $(-62.0)
TOTAL RECOMMENDED $31,166 $38,753 $29,961
416,897
kWh
$3,890
-
kW-mo/yr
$85
-
MMBtu
$(-2,770.0)
TOTAL IMPLEMENTED $4,735 $2,127 $4,563
63,505
kWh
$172
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings