| Assessment Year | 2013 |
|---|---|
| Principal Product | Lamb slaughtering and Processing |
| NAICS | 311611: Animal (except Poultry) Slaughtering |
| SIC | 2011: Meat Packing Plants |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
54,000
ft2
|
| Annual Production | 450,000
pieces
|
| Production Hrs. Annual | 2,990
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $152,485 | 3,824,132 |
kWh
|
$0.040 |
| Electricity Demand | $175,780 | 8,536 |
kW-mo/yr
|
$20.59 |
| Electricity Fees | $1,849 | - |
|
- |
| Natural Gas | $123,711 | 21,865 |
MMBtu
|
$5.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $33,920 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,780 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $6,330 | $14,900 |
$2,410
57,400
kWh
|
$3,920
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,540 | $200 |
$1,320
31,500
kWh
|
$1,220
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,340 | $8,100 |
$1,380
32,900
kWh
|
$960
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $890 | $350 | - | - |
$890
-
MMBtu
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,580 | $15,680 |
$7,020
167,600
kWh
|
$5,590
-
kW-mo/yr
|
- | $190 | - | $780 | |
| 06 | 2.8121: Apply for tax-free status for energy purchases | $8,240 | $1,500 | - | - | - | - | $8,240 | - | |
| TOTAL RECOMMENDED | $33,920 | $40,730 |
$12,130
289,400
kWh
|
$11,690
-
kW-mo/yr
|
$890
-
MMBtu
|
$190 | $8,240 | $780 | ||
| TOTAL IMPLEMENTED | $10,780 | $1,700 |
$1,320
31,500
kWh
|
$1,220
-
kW-mo/yr
|
- | - | $8,240 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs