Assessment Year | 1993 |
---|---|
Principal Product | Traffic Safety Radar |
NAICS |
n/a
|
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
53,920
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $58,597 | 968,933 |
kWh
|
$0.060 |
Natural Gas | $8,296 | 2,244 |
MMBtu
|
$3.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,163 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,703 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $2,316 | $3,168 |
$2,316
35,170
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $494 | $1,600 |
$494
7,620
kWh
|
- | |
03 | 2.2514: Cover open tanks | $1,525 | $1,125 |
$1,525
23,154
kWh
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $572 | $489 |
$753
11,430
kWh
|
$(-181.0)
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $560 | $350 |
$560
8,499
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $290 | $30 |
$290
4,396
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $116 | $100 |
$116
1,758
kWh
|
- | |
08 | 2.7229: Air condition only space necessary | $290 | $590 |
$290
4,396
kWh
|
- | |
TOTAL RECOMMENDED | $6,163 | $7,452 |
$6,344
96,423
kWh
|
$(-181.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,703 | $4,812 |
$4,884
74,150
kWh
|
$(-181.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs