ITAC Assessment: KU0406
ITAC logo
ITAC Assessment: KU0406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Traffic Safety Radar
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 53,920
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,597 968,933
kWh
Natural Gas $8,296 2,244
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,316 $3,168 $2,316
35,170
kWh
-
02 2.7135: Install occupancy sensors $494 $1,600 $494
7,620
kWh
-
03 2.2514: Cover open tanks $1,525 $1,125 $1,525
23,154
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $572 $489 $753
11,430
kWh
$(-181.0)
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $560 $350 $560
8,499
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $290 $30 $290
4,396
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $116 $100 $116
1,758
kWh
-
08 2.7229: Air condition only space necessary $290 $590 $290
4,396
kWh
-
TOTAL RECOMMENDED $6,163 $7,452 $6,344
96,423
kWh
$(-181.0)
-
MMBtu
TOTAL IMPLEMENTED $4,703 $4,812 $4,884
74,150
kWh
$(-181.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs