Assessment Year | 2001 |
---|---|
Principal Product | Industrial Machinery |
NAICS |
n/a
|
SIC | 3542: Machine Tools, Metal Forming Types |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
235,000
ft2
|
Annual Production | 1,450
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,200 | 1,234,332 |
kWh
|
$0.031 |
Electricity Demand | $41,184 | 5,148 |
kW-mo/yr
|
$8.00 |
Natural Gas | $90,929 | 17,136 |
MMBtu
|
$5.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $69,095 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,569 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $32,488 | $128,084 | - | - |
$20,496
-
MMBtu
|
$2,112
-
Tgal
|
- | - | $9,880 | - | |
02 | 3.8132: Use less toxic and volatile solvent substitutes | $13,412 | $700 | - | - | - | - | - |
$9,068
-
gal
|
- | $4,344 | |
03 | 3.4154: Eliminate leaks in water lines and valves | $12,127 | $196 | - | - | - |
$12,127
-
Tgal
|
- | - | - | - | |
04 | 2.2122: Install / repair insulation on condensate lines | $3,421 | $11,978 | - | - |
$3,421
-
MMBtu
|
- | - | - | - | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,301 | $1,000 | - | - | - | - |
$2,301
-
gal
|
- | - | - | |
06 | 3.4151: Minimize water usage | $1,740 | $22 | - | - | - | - |
$1,740
-
gal
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,534 | $1,619 |
$766
24,549
kWh
|
$768
-
kW-mo/yr
|
- | - | - | - | - | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $756 | $3,000 | - | - | - | - | - | - | $756 | - | |
09 | 2.7261: Install timers and/or thermostats | $675 | $225 |
$27
864
kWh
|
- |
$648
-
MMBtu
|
- | - | - | - | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $641 | $436 |
$285
9,200
kWh
|
$356
-
kW-mo/yr
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $69,095 | $147,260 |
$1,078
34,613
kWh
|
$1,124
-
kW-mo/yr
|
$24,565
-
MMBtu
|
$14,239
-
Tgal
|
$4,041
-
gal
|
$9,068
-
gal
|
$10,636 | $4,344 | ||
TOTAL IMPLEMENTED | $29,569 | $5,537 |
$766
24,549
kWh
|
$768
-
kW-mo/yr
|
- |
$12,127
-
Tgal
|
$1,740
-
gal
|
$9,068
-
gal
|
$756 | $4,344 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs