ITAC Assessment: AM0851
ITAC logo
ITAC Assessment: AM0851
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Marine engines, steam turbines, gas turbines
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 130,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,214
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,760 1,236,960
kWh
Electricity Demand $35,742 4,407
kW-mo/yr
Electricity Fees $9,320 -
Natural Gas $9,825 886
MMBtu
TOTAL YEARLY COSTS $121,647
RECOMMENDED SAVINGS* $52,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $462

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $42,809 $2,862 - - $7,449 $35,360
02 2.3212: Optimize plant power factor $7,294 $18,267 - $7,294
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $277 $972 $137
2,544
kWh
$140
-
kW-mo/yr
- -
04 2.4314: Use synthetic lubricant $185 $300 $92
1,696
kWh
$93
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $650 $1,795 $650
12,031
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $348 $750 $173
3,200
kWh
$175
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $580 $40 $250
4,700
kWh
$330
-
kW-mo/yr
- -
08 2.7134: Use photocell controls $120 $261 $120
2,200
kWh
- - -
TOTAL RECOMMENDED $52,263 $25,247 $1,422
26,371
kWh
$8,032
-
kW-mo/yr
$7,449 $35,360
TOTAL IMPLEMENTED $462 $1,272 $229
4,240
kWh
$233
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs