ITAC Assessment: SU0362
ITAC logo
ITAC Assessment: SU0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Electrical Fittings
NAICS 335932: Noncurrent-Carrying Wiring Device Manufacturing
SIC 3644: Noncurrent-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 118
Plant Area 139,887
ft2
Annual Production 1,520,000
units
Production Hrs. Annual 7,200
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $534,736 9,040,073
kWh
Electricity Demand $99,266 35,828
kW-mo/yr
Electricity Fees $4,677 -
Natural Gas $398,038 67,082
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,452

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2136: Install / repair insulation on steam lines $1,295 $202 - - $1,295
-
MMBtu
- -
02 2.7135: Install occupancy sensors $2,464 $1,840 $2,464
41,760
kWh
- - - -
03 2.6211: Conserve energy by efficient use of vending machines $1,404 $2,959 $1,404
23,795
kWh
- - - -
04 2.2414: Use waste heat from hot flue gases to preheat $8,593 $15,784 - - $8,593
-
MMBtu
- -
05 3.1161: Eliminate/reduce an operation $4,540 $15,840 $(-133.0)
(-2,256)
kWh
$(-1,097.0)
-
kW-mo/yr
- $1,080 $4,690
06 2.4321: Upgrade obsolete equipment $289 $1,250 $268
4,536
kWh
$21
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $18,585 $37,875 $4,003
67,835
kWh
$(-1,076.0)
-
kW-mo/yr
$9,888
-
MMBtu
$1,080 $4,690
TOTAL IMPLEMENTED $5,452 $6,251 $4,136
70,091
kWh
$21
-
kW-mo/yr
$1,295
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs