2,969
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LE0601 #09 Y:2025 | 09 | 2025 | Replace existing hvac unit with high efficiency model | $40,859 | $167,895 |
n/a
|
LE0601 #08 Y:2025 | 08 | 2025 | Utilize higher efficiency lamps and/or ballasts | $12,248 | $44,740 |
n/a
|
LE0601 #07 Y:2025 | 07 | 2025 | Use solar heat to make electricty | $72,625 | $210,000 |
n/a
|
LE0601 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $636 | $1,081 |
n/a
|
LE0601 #05 Y:2025 | 05 | 2025 | Use cooling tower or economizer to replace chiller cooling | $18,412 | $23,182 |
n/a
|
LE0601 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $55,828 | $52,000 |
n/a
|
LE0601 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,225 | $3,680 |
n/a
|
LE0601 #02 Y:2025 | 02 | 2025 | Install timers and/or thermostats | $44,588 | $1,600 |
n/a
|
LE0601 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $18,356 | - |
n/a
|
CI0044 #08 Y:2024 | 08 | 2024 | Recharge batteries on during off-peak demand periods | $2,241 | $1,500 |
n/a
|
CI0044 #07 Y:2024 | 07 | 2024 | Use / purchase optimum sized compressor | $5,415 | $5,000 |
n/a
|
CI0044 #06 Y:2024 | 06 | 2024 | Insulate bare equipment | $5,585 | $8,530 |
n/a
|
CI0044 #05 Y:2024 | 05 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,848 | $9,000 |
n/a
|
CI0044 #04 Y:2024 | 04 | 2024 | Insulate glazing, walls, ceilings, and roofs | $10,940 | $13,970 |
n/a
|
CI0044 #03 Y:2024 | 03 | 2024 | Use solar heat to make electricty | $13,426 | $93,790 |
n/a
|
CI0044 #02 Y:2024 | 02 | 2024 | Use optimum size and capacity equipment | $15,529 | $100,000 |
n/a
|
CI0044 #01 Y:2024 | 01 | 2024 | Install vinyl strip / high speed / air curtain doors | $43,028 | $180,000 |
n/a
|
LE0592 #09 Y:2024 | 09 | 2024 | Preheat combustion air with waste heat | $513 | $2,500 |
n/a
|
LE0592 #08 Y:2024 | 08 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,177 | $26,000 |
n/a
|
LE0592 #07 Y:2024 | 07 | 2024 | Use solar heat to make electricty | $43,842 | $126,000 |
n/a
|