Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21,058

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Food and kindred products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2501 #05 Y:2025 Replace existing equipment with more suitable substitutes $6,682 $32,756
UW2501 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $13,175 $10,269
UW2501 #03 Y:2025 Install occupancy sensors $8,699 $6,545
UW2501 #02 Y:2025 Repair or replace steam traps $83,082 $9,800
UW2501 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $52,448 $25,000
IP0207 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,969 $3,653
IP0207 #04 Y:2025 Install occupancy sensors $970 $1,387
IP0207 #03 Y:2025 Use or replace with energy efficient substitutes $184 $227
IP0207 #02 Y:2025 Optimize plant power factor $7,162 $5,708
IP0207 #01 Y:2025 Lower temperature during the winter season and vice-versa $7,560 -
AS0601 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $105 $180
AS0601 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $416 $942
AS0601 #05 Y:2025 Insulate bare equipment $852 $3,546
AS0601 #04 Y:2025 Use computer programs to optimize hvac performance $4,347 $618
AS0601 #03 Y:2025 Use solar heat to make electricty $21,962 $176,288
AS0601 #02 Y:2025 Recover and reuse waste material $76,561 $120,000
AS0601 #01 Y:2025 Add equipment/ operators to reduce production bottleneck $130,000 $66,000
DL0252 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $657 $1,000
DL0252 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $13,945 $9,000
DL0252 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $15,540 $1,500