21,472
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2603 #07 Y:2026 | 07 | 2026 | Utilize higher efficiency lamps and/or ballasts | $10,696 | $20,685 |
n/a
|
| UL2603 #06 Y:2026 | 06 | 2026 | Reduce illumination to minimum necessary levels | $7,891 | - |
n/a
|
| UL2603 #05 Y:2026 | 05 | 2026 | Use solar heat to make electricty | $102,792 | $1,093,593 |
n/a
|
| UL2603 #04 Y:2026 | 04 | 2026 | Lower ceiling to reduce conditioned space | $16,549 | $21,600 |
n/a
|
| UL2603 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $51,923 | $8,888 |
n/a
|
| UL2603 #02 Y:2026 | 02 | 2026 | Optimize plant power factor | $146,871 | $41,841 |
n/a
|
| UL2603 #01 Y:2026 | 01 | 2026 | Use outside cold water source as a supply of cooling water | $70,864 | $583,665 |
n/a
|
| SJ0045 #07 Y:2026 | 07 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $26,986 | - |
n/a
|
| SJ0045 #06 Y:2026 | 06 | 2026 | Insulate bare equipment | $37,880 | $17,625 |
n/a
|
| SJ0045 #05 Y:2026 | 05 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $1,865 | $1,023 |
n/a
|
| SJ0045 #04 Y:2026 | 04 | 2026 | Adopt in-house material generation | $357,338 | $572,004 |
n/a
|
| SJ0045 #03 Y:2026 | 03 | 2026 | Use solar heat to make electricty | $125,925 | $1,344,513 |
n/a
|
| SJ0045 #02 Y:2026 | 02 | 2026 | Modify refrigeration system to operate at a lower pressure | $61,426 | $144,392 |
n/a
|
| SJ0045 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $6,874 | $29,414 |
n/a
|
| NL0129 #05 Y:2026 | 05 | 2026 | Install occupancy sensors | $778 | $1,744 |
n/a
|
| NL0129 #04 Y:2026 | 04 | 2026 | Apply for tax-free status for energy purchases | $8,173 | $264 |
n/a
|
| NL0129 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $13,072 | $41,500 |
n/a
|
| NL0129 #02 Y:2026 | 02 | 2026 | Upgrade obsolete equipment | $226,046 | $346,302 |
n/a
|
| NL0129 #01 Y:2026 | 01 | 2026 | Add equipment/ operators to reduce production bottleneck | $15,722,064 | $5,073,962 |
n/a
|
| UL2602 #07 Y:2026 | 07 | 2026 | Recover waste heat from equipment | $22,369 | $25,000 |
n/a
|