Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21,787

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Food and kindred products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1150 #06 Y:2026 Use waste heat from hot flue gases to preheat $2,950 $8,050
UD1150 #05 Y:2026 Install compressor air intakes in coolest locations $1,310 $2,150
UD1150 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,680 -
UD1150 #03 Y:2026 Use flow control valves on equipment to optimize water use $9,875 $528
UD1150 #02 Y:2026 Reduce hot water temperature to the minimum required $31,563 -
UD1150 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,238 -
AM1003 #08 Y:2026 Use solar heat to make electricty $101,130 $815,980
AM1003 #07 Y:2026 Turn off equipment when not in use $8,900 $540
AM1003 #06 Y:2026 Reduce the pressure of compressed air to the minimum required $971 $9
AM1003 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $3,946 $1,830
AM1003 #04 Y:2026 Eliminate or reduce compressed air usage $360 $425
AM1003 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $761 $545
AM1003 #02 Y:2026 Meter recycled water (to reduce sewer charges) $40,935 -
AM1003 #01 Y:2026 Optimize plant power factor $5,740 $10,270
SF0653 #09 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $5,566 $24,058
SF0653 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $15,321 $27,270
SF0653 #07 Y:2026 Replace existing chiller with high efficiency model $76,884 $128,772
SF0653 #06 Y:2026 Install replacement doors $19,550 $30,389
SF0653 #05 Y:2026 Reduce space conditioning during non-working hours $23,134 $4,215
SF0653 #04 Y:2026 Insulate bare equipment $2,383 $358