ITAC Assessment: IP0215
ITAC logo
ITAC Assessment: IP0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Bread & Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 155
Plant Area 115,980
ft2
Annual Production 88,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $614,313 9,510,300
kWh
Electricity Demand $238,828 17,798
kW-mo/yr
Electricity Fees $6,368 -
Natural Gas $271,347 54,969
MMBtu
TOTAL YEARLY COSTS $1,130,856
RECOMMENDED SAVINGS* $199,615 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $14,470 - $10,873
167,282
kWh
$3,597
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $26,770 $1,390 $26,770
411,840
kWh
- -
03 2.7233: Use properly designed and sized hvac equipment $13,579 $790 $8,775
135,000
kWh
$4,026
-
kW-mo/yr
$778
-
MMBtu
04 2.6218: Turn off equipment when not in use $6,861 $128 $6,861
105,558
kWh
- -
05 2.7111: Reduce illumination to minimum necessary levels $2,235 $276 $1,679
25,834
kWh
$556
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $33,297 $5,271 $25,876
398,092
kWh
$7,421
-
kW-mo/yr
-
07 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $58,146 $9,960 $43,693
672,198
kWh
$14,453
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $5,523 $960 $4,292
66,024
kWh
$1,231
-
kW-mo/yr
-
09 2.1243: Use heat from boiler blowdown to preheat boiler feed water $10,982 $16,152 - - $10,982
-
MMBtu
10 2.3212: Optimize plant power factor $26,546 $45,576 - $26,546
-
kW-mo/yr
-
11 2.7492: Use proper thickness of insulation on building envelope $1,206 $2,279 $906
13,938
kWh
$300
-
kW-mo/yr
-
TOTAL RECOMMENDED $199,615 $82,782 $129,725
1,995,766
kWh
$58,130
-
kW-mo/yr
$11,760
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs