UU0193 #06 Y:2021 | 06 | 2021 | Install occupancy sensors | $946 | $3,500 | |
UU0193 #05 Y:2021 | 05 | 2021 | Reduce the pressure of compressed air to the minimum required | $1,875 | $5,000 | |
UU0193 #04 Y:2021 | 04 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,736 | $1,307 | |
UU0193 #03 Y:2021 | 03 | 2021 | Utilize higher efficiency lamps and/or ballasts | $2,764 | $4,720 | |
UU0193 #02 Y:2021 | 02 | 2021 | Reschedule plant operations or reduce load to avoid peaks | $371,933 | $40,000 | |
UU0193 #01 Y:2021 | 01 | 2021 | Use solar heat to make electricty | $269,225 | $7,636,800 | |
UU0145 #07 Y:2018 | 07 | 2018 | Use photocell controls | $661 | $440 | |
UU0145 #06 Y:2018 | 06 | 2018 | Utilize higher efficiency lamps and/or ballasts | $2,250 | $4,719 | |
UU0145 #05 Y:2018 | 05 | 2018 | Install compressor air intakes in coolest locations | $25,041 | $5,000 | |
UU0145 #04 Y:2018 | 04 | 2018 | Upgrade controls on compressors | $47,010 | $23,850 | |
UU0145 #03 Y:2018 | 03 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $68,566 | $36,000 | |
UU0145 #02 Y:2018 | 02 | 2018 | Reschedule plant operations or reduce load to avoid peaks | $373,488 | $10,000 | |
UU0145 #01 Y:2018 | 01 | 2018 | Add equipment/ operators to reduce production bottleneck | $377,567 | $872,000 | |
OR0392 #07 Y:2001 | 07 | 2001 | Replace existing equipment with more suitable substitutes | $149,400 | $426,960 | |
OR0392 #06 Y:2001 | 06 | 2001 | Use immersion heating in tanks, melting pots, etc | $200,000 | $493,000 | |
OR0392 #05 Y:2001 | 05 | 2001 | Eliminate or reduce compressed air usage | $137,600 | $58,600 | |
OR0392 #04 Y:2001 | 04 | 2001 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,400 | $7,500 | |
OR0392 #03 Y:2001 | 03 | 2001 | Replace direct fired with steam heat | $96,000 | $144,600 | |
OR0392 #02 Y:2001 | 02 | 2001 | Replace fossil fuel equipment with electrical equipment | $2,259,300 | $536,756 | |
OR0392 #01 Y:2001 | 01 | 2001 | Install emissions controls to increase capacity | $6,372,100 | $5,833,000 |