ITAC Assessment: OR0392
ITAC logo
ITAC Assessment: OR0392
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Refined Copper
NAICS
n/a
SIC 1021: Copper Ores
Sales Range greater than $500
M
# of Employees 2,300
Plant Area
n/a
Annual Production 310,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Natural Gas $10,664,164 2,666,041
MMBtu
Coal $15,605,350 17,477,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,221,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.3323: Install emissions controls to increase capacity $6,372,100 $5,833,000 $10,700,000
428,400,000
kWh
- $(-5,714,900.0)
-
MMBtu
- $(-63,000.0) $1,450,000
02 2.1321: Replace fossil fuel equipment with electrical equipment $2,259,300 $536,756 $(-2,180,000.0)
(-87,200,000)
kWh
$4,439,300
-
MMBtu
- - - -
03 2.1124: Replace direct fired with steam heat $96,000 $144,600 $(-420,000.0)
(-16,800,000)
kWh
$516,000
-
MMBtu
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,400 $7,500 $7,400
297,000
kWh
- - - - -
05 2.4239: Eliminate or reduce compressed air usage $137,600 $58,600 $137,600
5,504,000
kWh
- - - - -
06 2.2221: Use immersion heating in tanks, melting pots, etc $200,000 $493,000 - $200,000
-
MMBtu
- - - -
07 4.652: Replace existing equipment with more suitable substitutes $149,400 $426,960 - - - $149,400 - -
TOTAL RECOMMENDED $9,221,800 $7,500,416 $8,245,000
330,201,000
kWh
$5,155,300
-
MMBtu
$(-5,714,900.0)
-
MMBtu
$149,400 $(-63,000.0) $1,450,000
TOTAL IMPLEMENTED $7,400 $7,500 $7,400
297,000
kWh
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Coal Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs