Assessment Year | 2001 |
---|---|
Principal Product | Refined Copper |
NAICS |
n/a
|
SIC | 1021: Copper Ores |
Sales Range | greater than $500 M |
# of Employees | 2,300 |
Plant Area |
n/a
|
Annual Production | 310,000
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Natural Gas | $10,664,164 | 2,666,041 |
MMBtu
|
$4.00 |
Coal | $15,605,350 | 17,477,992 |
MMBtu
|
$0.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,221,800 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,400 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Coal Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3323: Install emissions controls to increase capacity | $6,372,100 | $5,833,000 |
$10,700,000
428,400,000
kWh
|
- |
$(-5,714,900.0)
-
MMBtu
|
- | $(-63,000.0) | $1,450,000 | |
02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $2,259,300 | $536,756 |
$(-2,180,000.0)
(-87,200,000)
kWh
|
$4,439,300
-
MMBtu
|
- | - | - | - | |
03 | 2.1124: Replace direct fired with steam heat | $96,000 | $144,600 |
$(-420,000.0)
(-16,800,000)
kWh
|
$516,000
-
MMBtu
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,400 | $7,500 |
$7,400
297,000
kWh
|
- | - | - | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $137,600 | $58,600 |
$137,600
5,504,000
kWh
|
- | - | - | - | - | |
06 | 2.2221: Use immersion heating in tanks, melting pots, etc | $200,000 | $493,000 | - |
$200,000
-
MMBtu
|
- | - | - | - | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $149,400 | $426,960 | - | - | - | $149,400 | - | - | |
TOTAL RECOMMENDED | $9,221,800 | $7,500,416 |
$8,245,000
330,201,000
kWh
|
$5,155,300
-
MMBtu
|
$(-5,714,900.0)
-
MMBtu
|
$149,400 | $(-63,000.0) | $1,450,000 | ||
TOTAL IMPLEMENTED | $7,400 | $7,500 |
$7,400
297,000
kWh
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Coal Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs