Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Copper ores
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0193 #06 Y:2021 Install occupancy sensors $946 $3,500
UU0193 #05 Y:2021 Reduce the pressure of compressed air to the minimum required $1,875 $5,000
UU0193 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,736 $1,307
UU0193 #03 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,764 $4,720
UU0193 #02 Y:2021 Reschedule plant operations or reduce load to avoid peaks $371,933 $40,000
UU0193 #01 Y:2021 Use solar heat to make electricty $269,225 $7,636,800
UU0145 #07 Y:2018 Use photocell controls $661 $440
UU0145 #06 Y:2018 Utilize higher efficiency lamps and/or ballasts $2,250 $4,719
UU0145 #05 Y:2018 Install compressor air intakes in coolest locations $25,041 $5,000
UU0145 #04 Y:2018 Upgrade controls on compressors $47,010 $23,850
UU0145 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $68,566 $36,000
UU0145 #02 Y:2018 Reschedule plant operations or reduce load to avoid peaks $373,488 $10,000
UU0145 #01 Y:2018 Add equipment/ operators to reduce production bottleneck $377,567 $872,000
OR0392 #07 Y:2001 Replace existing equipment with more suitable substitutes $149,400 $426,960
OR0392 #06 Y:2001 Use immersion heating in tanks, melting pots, etc $200,000 $493,000
OR0392 #05 Y:2001 Eliminate or reduce compressed air usage $137,600 $58,600
OR0392 #04 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $7,400 $7,500
OR0392 #03 Y:2001 Replace direct fired with steam heat $96,000 $144,600
OR0392 #02 Y:2001 Replace fossil fuel equipment with electrical equipment $2,259,300 $536,756
OR0392 #01 Y:2001 Install emissions controls to increase capacity $6,372,100 $5,833,000