Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Crop preparation services for market, except cotton ginning
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2217 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $108 -
UW2217 #03 Y:2022 Use most efficient type of electric motors $2,705 $9,295
UW2217 #02 Y:2022 Install occupancy sensors $997 $1,779
UW2217 #01 Y:2022 Use solar heat to make electricty $6,995 $28,937
UW2216 #03 Y:2022 Reduce space conditioning during non-working hours $4,366 $760
UW2216 #02 Y:2022 Install occupancy sensors $1,223 $836
UW2216 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $5,121 $14,855
OR0733 #03 Y:2019 Insulate bare equipment $1,400 $4,362
OR0733 #02 Y:2019 Use optimum temperature $3,294 $5,000
OR0733 #01 Y:2019 Install anaerobic digester $30,707 $224,950
SF0480 #09 Y:2016 Use solar heat to make electricty $96,947 $904,867
SF0480 #08 Y:2016 Install occupancy sensors $6,041 $31,062
SF0480 #07 Y:2016 Utilize higher efficiency lamps and/or ballasts $6,524 $22,649
SF0480 #06 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $5,322 $10,120
SF0480 #05 Y:2016 Utilize controls to operate equipment only when needed $6,005 $4,163
SF0480 #04 Y:2016 Utilize energy-efficient belts and other improved mechanisms $1,097 $219
SF0480 #03 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $5,403 $354
SF0480 #02 Y:2016 Turn off equipment when not in use $187 -
SF0480 #01 Y:2016 Minimize operation of equipment maintained in standby condition $2,228 -
SF0443 #11 Y:2013 Use solar heat to make electricty $67,869 $444,663