ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UW2217 #04 Y:2022 | 04 | 2022 | Reduce the pressure of compressed air to the minimum required | $108 | - | |
UW2217 #03 Y:2022 | 03 | 2022 | Use most efficient type of electric motors | $2,705 | $9,295 | |
UW2217 #02 Y:2022 | 02 | 2022 | Install occupancy sensors | $997 | $1,779 | |
UW2217 #01 Y:2022 | 01 | 2022 | Use solar heat to make electricty | $6,995 | $28,937 | |
UW2216 #03 Y:2022 | 03 | 2022 | Reduce space conditioning during non-working hours | $4,366 | $760 | |
UW2216 #02 Y:2022 | 02 | 2022 | Install occupancy sensors | $1,223 | $836 | |
UW2216 #01 Y:2022 | 01 | 2022 | Utilize higher efficiency lamps and/or ballasts | $5,121 | $14,855 | |
OR0733 #03 Y:2019 | 03 | 2019 | Insulate bare equipment | $1,400 | $4,362 | |
OR0733 #02 Y:2019 | 02 | 2019 | Use optimum temperature | $3,294 | $5,000 | |
OR0733 #01 Y:2019 | 01 | 2019 | Install anaerobic digester | $30,707 | $224,950 | |
SF0480 #09 Y:2016 | 09 | 2016 | Use solar heat to make electricty | $96,947 | $904,867 | |
SF0480 #08 Y:2016 | 08 | 2016 | Install occupancy sensors | $6,041 | $31,062 | |
SF0480 #07 Y:2016 | 07 | 2016 | Utilize higher efficiency lamps and/or ballasts | $6,524 | $22,649 | |
SF0480 #06 Y:2016 | 06 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $5,322 | $10,120 | |
SF0480 #05 Y:2016 | 05 | 2016 | Utilize controls to operate equipment only when needed | $6,005 | $4,163 | |
SF0480 #04 Y:2016 | 04 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $1,097 | $219 | |
SF0480 #03 Y:2016 | 03 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,403 | $354 | |
SF0480 #02 Y:2016 | 02 | 2016 | Turn off equipment when not in use | $187 | - | |
SF0480 #01 Y:2016 | 01 | 2016 | Minimize operation of equipment maintained in standby condition | $2,228 | - | |
SF0443 #11 Y:2013 | 11 | 2013 | Use solar heat to make electricty | $67,869 | $444,663 |