ITAC Assessment: IP7023
ITAC logo
ITAC Assessment: IP7023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Corn Seed Preparation for Market
NAICS 111150: Corn Farming
SIC 0723: Crop Preparation Services for Market, Except Cotton Ginning
Sales Range $100
M
to 500
M
# of Employees 34
Plant Area 165,847
ft2
Annual Production 804,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,837 1,274,000
kWh
Electricity Demand $32,214 4,130
kW-mo/yr
Electricity Fees $9,668 -
Natural Gas $8,088 1,374
MMBtu
Waste Disposal Costs
Water Usage $988 17
Tgal
Water Disposal $1,461 17
Tgal
Solid Waste (non-haz) $4,088 16,712
lb
TOTAL YEARLY COSTS $169,344
RECOMMENDED SAVINGS* $70,428 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,453 - $3,453
38,800
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $40,842 $4,580 $40,842
458,900
kWh
-
03 2.7135: Install occupancy sensors $4,939 $1,890 $4,939
55,490
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,497 $1,035 $1,255
14,105
kWh
$242
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $19,697 $48,405 $15,887
178,503
kWh
$3,810
-
kW-mo/yr
TOTAL RECOMMENDED $70,428 $55,910 $66,376
745,798
kWh
$4,052
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs