| Assessment Year | 2025 |
|---|---|
| Principal Product | Corn Seed Preparation for Market |
| NAICS | 111150: Corn Farming |
| SIC | 0723: Crop Preparation Services for Market, Except Cotton Ginning |
| Sales Range | $100 M to 500M |
| # of Employees | 34 |
| Plant Area |
165,847
ft2
|
| Annual Production | 804,000
pieces
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $112,837 | 1,274,000 |
kWh
|
$0.089 | |
| Electricity Demand | $32,214 | 4,130 |
kW-mo/yr
|
$7.80 | |
| Electricity Fees | $9,668 | - |
|
- | |
| Natural Gas | $8,088 | 1,374 |
MMBtu
|
$5.89 | |
| Waste Disposal Costs | |||||
| Water Usage | $988 | 17 |
Tgal
|
$59.09 | |
| Water Disposal | $1,461 | 17 |
Tgal
|
$87.41 | |
| Solid Waste (non-haz) | $4,088 | 16,712 |
lb
|
$0.24 | |
| TOTAL YEARLY COSTS | $169,344 | ||||
| RECOMMENDED SAVINGS* | $70,428 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $3,453 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,453 | - |
$3,453
38,800
kWh
|
- | |
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $40,842 | $4,580 |
$40,842
458,900
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $4,939 | $1,890 |
$4,939
55,490
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,497 | $1,035 |
$1,255
14,105
kWh
|
$242
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,697 | $48,405 |
$15,887
178,503
kWh
|
$3,810
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $70,428 | $55,910 |
$66,376
745,798
kWh
|
$4,052
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $3,453 | - |
$3,453
38,800
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs