Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product AL. AND STEEL CANS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $50
M
to 100
M
# of Employees 154
Plant Area
n/a
Annual Production 433,000,000
pieces
Production Hrs. Annual 6,264
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $440,694 10,917,937
kWh
Natural Gas $235,311 110,548
MMBtu
Other Energy $78,040 19,368
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,287

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.2425: Use flue gases to heat process or service water $45,950 $48,000 - $(-18,390.0)
-
MMBtu
$64,340
-
MMBtu
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $17,158 $19,000 $2,827
70,047
kWh
- - $14,331
03 2.4221: Install compressor air intakes in coolest locations $3,620 $2,000 $3,620
89,683
kWh
- - -
04 2.4133: Use most efficient type of electric motors $1,875 $2,875 $1,875
46,600
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,003 $19,646 $7,003
173,505
kWh
- - -
06 2.6127: Maintain air filters by cleaning or replacement $1,349 $700 $1,349
33,411
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $340 - $450
11,137
kWh
- - $(-110.0)
08 2.7134: Use photocell controls $835 $400 $835
20,809
kWh
- - -
09 2.7135: Install occupancy sensors $769 $1,260 $769
19,050
kWh
- - -
10 2.6121: Reduce hot water temperature to the minimum required $100 $10 - $100
-
MMBtu
- -
TOTAL RECOMMENDED $78,999 $93,891 $18,728
464,242
kWh
$(-18,290.0)
-
MMBtu
$64,340
-
MMBtu
$14,221
TOTAL IMPLEMENTED $14,287 $25,231 $14,297
354,336
kWh
$100
-
MMBtu
- $(-110.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs