ITAC Assessment: NL0138
ITAC logo
ITAC Assessment: NL0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Packaged Potatoes
NAICS 115114: Postharvest Crop Activities (except Cotton Ginning)
SIC 0723: Crop Preparation Services for Market, Except Cotton Ginning
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 105,637
ft2
Annual Production 54,000,000
lb
Production Hrs. Annual 2,040
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,318 929,527
kWh
Electricity Demand $25,066 2,979
kW-mo/yr
Electricity Fees $4,673 -
Waste Disposal Costs
Water Usage $36,283 4,305
Tgal
TOTAL YEARLY COSTS $121,340
RECOMMENDED SAVINGS* $202,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.515: Install shelves / racks to utilize unused space $150,000 $1,500,000 - - - - $150,000
02 4.441: Install automatic packing equipment $52,500 $38,750 - - $52,500 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $123 $500 $343
5,712
kWh
- $(-120.0) $(-100.0) -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $86 $323 $42
695
kWh
$44
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $202,709 $1,539,573 $385
6,407
kWh
$44
-
kW-mo/yr
$52,380 $(-100.0) $150,000
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs