ITAC Assessment: UF0366
ITAC logo
ITAC Assessment: UF0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Dimensioned Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 150,000
ft2
Annual Production 220,000
thousand feet
Production Hrs. Annual 6,084
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,327,138 29,606,560
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,025,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,324

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,767 $10,560 $12,767
290,160
kWh
-
02 2.7124: Make a practice of turning off lights when not needed $5,584 $2,089 $5,584
126,906
kWh
-
03 2.7141: Lower light fixtures in high ceiling areas $9,884 $784 $9,884
224,640
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,012 - $3,012
68,444
kWh
-
05 2.4133: Use most efficient type of electric motors $33,761 $64,979 $33,761
767,286
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $2,146 $640 $2,146
48,769
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,852 $4,653 $25,852
587,548
kWh
-
08 2.4226: Use / purchase optimum sized compressor $4,587 $22,333 $4,587
104,250
kWh
-
09 2.3212: Optimize plant power factor $39,191 $15,000 $39,191
890,698
kWh
-
10 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $1,302,689 $10,000,000 $1,302,689
29,606,560
kWh
-
11 2.2511: Insulate bare equipment $11,128 $1,356 - $11,128
-
MMBtu
12 4.651: Install back-up equipment $569,932 $520,000 $569,932
12,953,000
kWh
-
13 4.424: Improve space comfort conditioning $5,448 $24,800 $5,448
123,820
kWh
-
TOTAL RECOMMENDED $2,025,980 $10,667,194 $2,014,852
45,792,081
kWh
$11,128
-
MMBtu
TOTAL IMPLEMENTED $143,324 $100,061 $132,196
3,004,451
kWh
$11,128
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs