Assessment Year | 2005 |
---|---|
Principal Product | Dimensioned Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $50 M to 100M |
# of Employees | 220 |
Plant Area |
150,000
ft2
|
Annual Production | 220,000
thousand feet
|
Production Hrs. Annual | 6,084
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,327,138 | 29,606,560 |
kWh
|
$0.045 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $2,025,980 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $143,324 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,767 | $10,560 |
$12,767
290,160
kWh
|
- | |
02 | 2.7124: Make a practice of turning off lights when not needed | $5,584 | $2,089 |
$5,584
126,906
kWh
|
- | |
03 | 2.7141: Lower light fixtures in high ceiling areas | $9,884 | $784 |
$9,884
224,640
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,012 | - |
$3,012
68,444
kWh
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $33,761 | $64,979 |
$33,761
767,286
kWh
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,146 | $640 |
$2,146
48,769
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $25,852 | $4,653 |
$25,852
587,548
kWh
|
- | |
08 | 2.4226: Use / purchase optimum sized compressor | $4,587 | $22,333 |
$4,587
104,250
kWh
|
- | |
09 | 2.3212: Optimize plant power factor | $39,191 | $15,000 |
$39,191
890,698
kWh
|
- | |
10 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $1,302,689 | $10,000,000 |
$1,302,689
29,606,560
kWh
|
- | |
11 | 2.2511: Insulate bare equipment | $11,128 | $1,356 | - |
$11,128
-
MMBtu
|
|
12 | 4.651: Install back-up equipment | $569,932 | $520,000 |
$569,932
12,953,000
kWh
|
- | |
13 | 4.424: Improve space comfort conditioning | $5,448 | $24,800 |
$5,448
123,820
kWh
|
- | |
TOTAL RECOMMENDED | $2,025,980 | $10,667,194 |
$2,014,852
45,792,081
kWh
|
$11,128
-
MMBtu
|
||
TOTAL IMPLEMENTED | $143,324 | $100,061 |
$132,196
3,004,451
kWh
|
$11,128
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |