ITAC Assessment: OK0922
ITAC logo
ITAC Assessment: OK0922
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Hand Tools
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 104,258
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,401 4,063,332
kWh
Electricity Demand $98,727 15,671
kW-mo/yr
Natural Gas $14,903 3,346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $950 $580 $950
16,825
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,502 $30,324 $5,345
95,441
kWh
$1,157
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $25,204 $77,600 $20,744
370,432
kWh
$4,460
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $37,221 $46,451 - - $37,221 -
05 2.7231: Use radiant heater for spot heating $2,132 $6,660 - - - $2,132
-
MMBtu
06 2.2628: Utilize a less expensive cooling method $10,800 $22,080 $8,154
145,600
kWh
$2,646
-
kW-mo/yr
- -
07 2.7211: Clean and maintain refrigerant condensers and towers $2,660 $720 $1,469
26,225
kWh
$1,191
-
kW-mo/yr
- -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,542 $780 $1,542
27,534
kWh
- - -
09 2.6211: Conserve energy by efficient use of vending machines $656 $690 $656
11,618
kWh
- - -
TOTAL RECOMMENDED $87,666 $185,885 $38,859
693,675
kWh
$9,455
-
kW-mo/yr
$37,221 $2,132
-
MMBtu
TOTAL IMPLEMENTED $34,366 $108,644 $27,558
492,098
kWh
$6,809
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs