Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Horticultural specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0568 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $84 $345
AS0568 #03 Y:2023 Use most efficient type of electric motors $822 $7,680
AS0568 #02 Y:2023 Use solar heat to make electricty $13,401 $115,340
AS0568 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $14,858 $4,846
CO0743 #05 Y:2022 Purchase gas directly from a contract gas supplier $7,800 $26,000
CO0743 #04 Y:2022 Recover and reuse waste material $1,718 $4,820
CO0743 #03 Y:2022 Install spectral reflectors / delamp $2,506 $9,960
CO0743 #02 Y:2022 Use heat pump for space conditioning $9,304 $42,082
CO0743 #01 Y:2022 Use solar heat to make electricty $9,876 $84,276
LS2203 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,505 $3,841
LS2203 #04 Y:2021 Modify facility to avoid excess maintenance costs $40,432 $24,848
LS2203 #03 Y:2021 Install occupancy sensors $179 $76
LS2203 #02 Y:2021 Utilize daylight whenever possible in lieu of artificial light $747 $300
LS2203 #01 Y:2021 Use a different or recycled raw material $91,930 $8,070
DL0120 #10 Y:2013 Repair or replace steam traps $1,770 $350
DL0120 #09 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,260 $300
DL0120 #08 Y:2013 Utilize a less expensive cooling method $52,252 $500,000
DL0120 #07 Y:2013 Replace obsolete burners with more efficient ones $44,085 $50,000
DL0120 #06 Y:2013 Install automatic stack damper $22,042 $16,000
DL0120 #05 Y:2013 Recover waste heat from equipment $338,000 $400,000