| Assessment Year | 2014 |
|---|---|
| Principal Product | Mushrooms |
| NAICS | 111411: Mushroom Production |
| SIC | 0182: Food Crops Grown Under Cover |
| Sales Range | $500 k to 1M |
| # of Employees | 100 |
| Plant Area |
220,000
ft2
|
| Annual Production | 200,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $785,939 | 8,664,000 |
kWh
|
$0.091 |
| Fuel Oil #2 | $543,411 | 24,199 |
MMBtu
|
$22.46 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $717,670 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,541 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $62,900 | $38,400 |
$62,900
691,100
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,777 | $116,160 |
$16,777
184,365
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,734 | $9,000 |
$1,734
19,053
kWh
|
- | |
| 04 | 2.2441: Preheat boiler makeup water with waste process heat | $176,850 | $624,000 |
$176,850
1,943,400
kWh
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $338,000 | $400,000 | - |
$338,000
-
MMBtu
|
|
| 06 | 2.1123: Install automatic stack damper | $22,042 | $16,000 | - |
$22,042
-
MMBtu
|
|
| 07 | 2.1221: Replace obsolete burners with more efficient ones | $44,085 | $50,000 | - |
$44,085
-
MMBtu
|
|
| 08 | 2.2628: Utilize a less expensive cooling method | $52,252 | $500,000 |
$52,252
574,200
kWh
|
- | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,260 | $300 |
$1,260
13,840
kWh
|
- | |
| 10 | 2.2113: Repair or replace steam traps | $1,770 | $350 | - |
$1,770
-
MMBtu
|
|
| TOTAL RECOMMENDED | $717,670 | $1,754,210 |
$311,773
3,425,958
kWh
|
$405,897
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $21,541 | $125,810 |
$19,771
217,258
kWh
|
$1,770
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs