ITAC Assessment: CO0743
ITAC logo
ITAC Assessment: CO0743
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Agricultural Products
NAICS 111419: Other Food Crops Grown Under Cover
SIC 0182: Food Crops Grown Under Cover
Sales Range $10
M
to 50
M
# of Employees 27
Plant Area 9,900
ft2
Annual Production 1,400
lb
Production Hrs. Annual 4,500
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,201 1,253,280
kWh
Electricity Demand $43,504 3,270
kW-mo/yr
Natural Gas $8,955 1,203
MMBtu
Waste Disposal Costs
Water Usage $3,000 420
Tgal
TOTAL YEARLY COSTS $109,660
RECOMMENDED SAVINGS* $31,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $9,876 $84,276 $6,226
144,112
kWh
$3,650
-
kW-mo/yr
- -
02 2.7234: Use heat pump for space conditioning $9,304 $42,082 $369
8,540
kWh
- $8,935
-
MMBtu
-
03 2.7144: Install spectral reflectors / delamp $2,506 $9,960 $1,357
31,551
kWh
$1,149
-
kW-mo/yr
- -
04 3.5311: Recover and reuse waste material $1,718 $4,820 - - - $1,718
05 2.8113: Purchase gas directly from a contract gas supplier $7,800 $26,000 - - - $7,800
TOTAL RECOMMENDED $31,204 $167,138 $7,952
184,203
kWh
$4,799
-
kW-mo/yr
$8,935
-
MMBtu
$9,518
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs