ITAC Assessment: AS0568
ITAC logo
ITAC Assessment: AS0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Planting and cultivating
NAICS 115112: Soil Preparation, Planting, and Cultivating
SIC 0181: Ornamental Floriculture and Nursery Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 3,500,000
ft2
Annual Production 2,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,781 689,681
kWh
Electricity Demand $20,304 2,453
kW-mo/yr
Electricity Fees $44,483 -
Waste Disposal Costs
Water Usage $2,429 175
Tgal
TOTAL YEARLY COSTS $123,997
RECOMMENDED SAVINGS* $29,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,858 $4,846 $13,138
159,632
kWh
$1,720
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $13,401 $115,340 $13,001
157,976
kWh
$400
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $822 $7,680 $691
8,399
kWh
$131
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $84 $345 - - $84
TOTAL RECOMMENDED $29,165 $128,211 $26,830
326,007
kWh
$2,251
-
kW-mo/yr
$84
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs