ITAC Assessment: MS0337
ITAC logo
ITAC Assessment: MS0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Steel Tubing
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $100
M
to 500
M
# of Employees 140
Plant Area 30,700
ft2
Annual Production 600,000,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $622,464 11,381,400
kWh
Electricity Demand $311,122 23,816
kW-mo/yr
Electricity Fees $14,658 -
Natural Gas $1,712,065 157,798
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $372,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $284,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2514: Cover open tanks $284,008 $8,869 - - - $284,008
-
MMBtu
02 2.2442: Preheat combustion air with waste heat $43,299 $6,450 - - - $43,299
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $38,691 $2,000 - - - $38,691
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,045 $5,142 $3,985
56,849
kWh
- $60 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,874 $4,735 $1,935
29,709
kWh
$897
-
kW-mo/yr
$42 -
TOTAL RECOMMENDED $372,917 $27,196 $5,920
86,558
kWh
$897
-
kW-mo/yr
$102 $365,998
-
MMBtu
TOTAL IMPLEMENTED $284,008 $8,869 - - - $284,008
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs