Assessment Year | 2009 |
---|---|
Principal Product | Steel Tubing |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $100 M to 500M |
# of Employees | 140 |
Plant Area |
30,700
ft2
|
Annual Production | 600,000,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $622,464 | 11,381,400 |
kWh
|
$0.055 |
Electricity Demand | $311,122 | 23,816 |
kW-mo/yr
|
$13.06 |
Electricity Fees | $14,658 | - |
|
- |
Natural Gas | $1,712,065 | 157,798 |
MMBtu
|
$10.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $372,917 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $284,008 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2514: Cover open tanks | $284,008 | $8,869 | - | - | - |
$284,008
-
MMBtu
|
|
02 | 2.2442: Preheat combustion air with waste heat | $43,299 | $6,450 | - | - | - |
$43,299
-
MMBtu
|
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $38,691 | $2,000 | - | - | - |
$38,691
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,045 | $5,142 |
$3,985
56,849
kWh
|
- | $60 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,874 | $4,735 |
$1,935
29,709
kWh
|
$897
-
kW-mo/yr
|
$42 | - | |
TOTAL RECOMMENDED | $372,917 | $27,196 |
$5,920
86,558
kWh
|
$897
-
kW-mo/yr
|
$102 |
$365,998
-
MMBtu
|
||
TOTAL IMPLEMENTED | $284,008 | $8,869 | - | - | - |
$284,008
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs