ITAC Assessment: SU0384
ITAC logo
ITAC Assessment: SU0384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Water Pumps
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $1
M
to 5
M
# of Employees 260
Plant Area 305,000
ft2
Annual Production 749,589
pieces
Production Hrs. Annual 6,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,634 3,497,187
kWh
Electricity Demand $22,016 7,895
kW-mo/yr
Electricity Fees $15,917 -
Natural Gas $130,771 15,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $11,706 - - - - - $11,706 - -
02 4.821: Pay bills on time to avoid late fees $1,732 - - - - - - - $1,732
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,555 - $1,555
26,577
kWh
- - - - - -
04 2.4322: Use or replace with energy efficient substitutes $326 - $263
4,500
kWh
$63
-
kW-mo/yr
- - - - -
05 2.2123: Insulate feedwater tank $544 $186 - - $544
-
MMBtu
- - - -
06 2.7135: Install occupancy sensors $1,002 $952 $1,002
17,136
kWh
- - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,109 $3,650 $3,109
53,152
kWh
- - - - - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $2,005 $4,074 $(-212.0)
(-3,628)
kWh
$(-33.0)
-
kW-mo/yr
$2,250
-
MMBtu
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $572 $1,267 $154
2,628
kWh
$10
-
kW-mo/yr
- $408 - - -
10 2.4221: Install compressor air intakes in coolest locations $429 $1,129 $429
7,331
kWh
- - - - - -
11 2.6211: Conserve energy by efficient use of vending machines $289 $817 $289
4,942
kWh
- - - - - -
12 2.7135: Install occupancy sensors $47 $159 $47
795
kWh
- - - - - -
13 3.4151: Minimize water usage $5,347 $23,500 - - - - - $5,347
-
Tgal
-
TOTAL RECOMMENDED $28,663 $35,734 $6,636
113,433
kWh
$40
-
kW-mo/yr
$2,794
-
MMBtu
$408 $11,706 $5,347
-
Tgal
$1,732
TOTAL IMPLEMENTED $16,836 $4,467 $3,398
58,094
kWh
- - - $11,706 - $1,732
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs