ITAC Assessment: AS0438
ITAC logo
ITAC Assessment: AS0438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Modular trench drains
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 80,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,359 835,500
kWh
Electricity Demand $27,701 3,189
kW-mo/yr
Electricity Fees $8,360 -
LPG $11,448 251
MMBtu
Waste Disposal Costs
Water Usage $13,077 3,254
Tgal
TOTAL YEARLY COSTS $140,945
RECOMMENDED SAVINGS* $18,934 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,882

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,271 $100 $894
13,353
kWh
$377
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,534 $60 $2,486
37,138
kWh
$1,048
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $490 $609 $172
2,566
kWh
$105
-
kW-mo/yr
$213
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,583 $45,665 $5,830
87,109
kWh
$4,753
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,028 $329 $731
10,917
kWh
$297
-
kW-mo/yr
-
06 2.7261: Install timers and/or thermostats $2,028 $7,653 $2,028
30,300
kWh
- -
TOTAL RECOMMENDED $18,934 $54,416 $12,141
181,383
kWh
$6,580
-
kW-mo/yr
$213
TOTAL IMPLEMENTED $12,882 $46,094 $7,455
111,379
kWh
$5,427
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs