Assessment Year | 2017 |
---|---|
Principal Product | Modular trench drains |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
80,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $80,359 | 835,500 |
kWh
|
$0.096 | |
Electricity Demand | $27,701 | 3,189 |
kW-mo/yr
|
$8.69 | |
Electricity Fees | $8,360 | - |
|
- | |
LPG | $11,448 | 251 |
MMBtu
|
$45.53 | |
Waste Disposal Costs | |||||
Water Usage | $13,077 | 3,254 |
Tgal
|
$4.02 | |
TOTAL YEARLY COSTS | $140,945 | ||||
RECOMMENDED SAVINGS* | $18,934 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $12,882 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,271 | $100 |
$894
13,353
kWh
|
$377
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,534 | $60 |
$2,486
37,138
kWh
|
$1,048
-
kW-mo/yr
|
- | |
03 | 2.4314: Use synthetic lubricant | $490 | $609 |
$172
2,566
kWh
|
$105
-
kW-mo/yr
|
$213 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,583 | $45,665 |
$5,830
87,109
kWh
|
$4,753
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $1,028 | $329 |
$731
10,917
kWh
|
$297
-
kW-mo/yr
|
- | |
06 | 2.7261: Install timers and/or thermostats | $2,028 | $7,653 |
$2,028
30,300
kWh
|
- | - | |
TOTAL RECOMMENDED | $18,934 | $54,416 |
$12,141
181,383
kWh
|
$6,580
-
kW-mo/yr
|
$213 | ||
TOTAL IMPLEMENTED | $12,882 | $46,094 |
$7,455
111,379
kWh
|
$5,427
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs