Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Colleges, universities, and professional schools
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM38 #09 Y:2026 Install / repair insulation on steam lines $83 $114
MUCM38 #08 Y:2026 Use photocell controls $120 $585
MUCM38 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $187 $100
MUCM38 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $376 $2,050
MUCM38 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $486 $272
MUCM38 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $724 -
MUCM38 #03 Y:2026 Improve air circulation with destratification fans / other methods $963 $4,233
MUCM38 #02 Y:2026 Install occupancy sensors $1,102 $752
MUCM38 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $23,213 $56,756
MUCM37 #09 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,408 $6,089
MUCM37 #08 Y:2026 Use photocell controls $1,433 $2,381
MUCM37 #07 Y:2026 Make a practice of turning off lights when not needed $15 -
MUCM37 #06 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $746 $3,008
MUCM37 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $155 -
MUCM37 #04 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,071 $207
MUCM37 #03 Y:2026 Install / repair insulation on steam lines $262 $97
MUCM37 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,015 $14,417
MUCM37 #01 Y:2026 Install occupancy sensors $6,709 $14,664
ORC025 #03 Y:2026 Repair or replace steam traps $6,452 $1,432
ORC025 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,575 $4,361