| Assessment Year | 2026 |
|---|---|
| Principal Product | Library |
| NAICS | 611310: Colleges, Universities, and Professional Schools |
| SIC | 8221: Colleges, Universities, and Professional Schools |
| Sales Range | less than $500 k |
| # of Employees | 50 |
| Plant Area |
99,005
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 7,280
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $40,930 | 876,242 |
kWh
|
$0.047 |
| Electricity Demand | $20,149 | 3,077 |
kW-mo/yr
|
$6.55 |
| Electricity Fees | $1,889 | - |
|
- |
| Other Gas | $1,879 | 1 |
MMBtu
|
$1,879.00 |
| Other Energy | $92,049 | 12,090 |
MMBtu
|
$7.61 |
| TOTAL YEARLY COSTS | $156,896 | |||
| RECOMMENDED SAVINGS* | $17,854 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $6,709 | $14,664 |
$4,715
100,323
kWh
|
$1,994
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,015 | $14,998 |
$3,155
67,127
kWh
|
$860
-
kW-mo/yr
|
- | |
| 03 | 2.2136: Install / repair insulation on steam lines | $301 | $97 | - | - |
$301
-
MMBtu
|
|
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,071 | $207 |
$871
18,527
kWh
|
$200
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $155 | - |
$130
2,775
kWh
|
$25
-
kW-mo/yr
|
- | |
| 06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $746 | $3,137 |
$627
13,336
kWh
|
$120
-
kW-mo/yr
|
- | |
| 07 | 2.7124: Make a practice of turning off lights when not needed | $15 | - |
$11
230
kWh
|
$4
-
kW-mo/yr
|
- | |
| 08 | 2.7134: Use photocell controls | $1,433 | $2,381 |
$1,095
23,305
kWh
|
$338
-
kW-mo/yr
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,408 | $6,089 |
$2,527
53,769
kWh
|
$881
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $17,854 | $41,573 |
$13,131
279,392
kWh
|
$4,422
-
kW-mo/yr
|
$301
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs