ITAC Assessment: CO0729
ITAC logo
ITAC Assessment: CO0729
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Semiconductor manufacturing equipment
NAICS 333242: Semiconductor Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 51,200
ft2
Annual Production 80
units
Production Hrs. Annual 8,760
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,789 9,510,440
kWh
Electricity Demand $90,616 15,588
kW-mo/yr
Electricity Fees $2,717 -
Natural Gas $106,663 15,985
MMBtu
Waste Disposal Costs
Other Liquid (haz) $36,000 13,500
gal
TOTAL YEARLY COSTS $599,785
RECOMMENDED SAVINGS* $129,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $70,080 $60,480 - - $40,080
-
MMBtu
$30,000
-
gal
- -
02 3.5142: Treat and reuse equipment cleaning solutions $25,340 $123,200 $(-2,840.0)
(-72,900)
kWh
$(-620.0)
-
kW-mo/yr
- - - $28,800
03 2.7142: Utilize higher efficiency lamps and/or ballasts $31,510 $51,780 $24,580
606,300
kWh
$5,010
-
kW-mo/yr
- - $610 $1,310
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,100 $6,040 $1,720
44,200
kWh
$380
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $129,030 $241,500 $23,460
577,600
kWh
$4,770
-
kW-mo/yr
$40,080
-
MMBtu
$30,000
-
gal
$610 $30,110
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs