Assessment Year | 2016 |
---|---|
Principal Product | Semiconductor manufacturing equipment |
NAICS | 333242: Semiconductor Machinery Manufacturing |
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 225 |
Plant Area |
51,200
ft2
|
Annual Production | 80
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Montana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $363,789 | 9,510,440 |
kWh
|
$0.038 | |
Electricity Demand | $90,616 | 15,588 |
kW-mo/yr
|
$5.81 | |
Electricity Fees | $2,717 | - |
|
- | |
Natural Gas | $106,663 | 15,985 |
MMBtu
|
$6.67 | |
Waste Disposal Costs | |||||
Other Liquid (haz) | $36,000 | 13,500 |
gal
|
$2.67 | |
TOTAL YEARLY COSTS | $599,785 | ||||
RECOMMENDED SAVINGS* | $129,030 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.6112: Use filter and drying oven to reduce sludge volume | $70,080 | $60,480 | - | - |
$40,080
-
MMBtu
|
$30,000
-
gal
|
- | - | |
02 | 3.5142: Treat and reuse equipment cleaning solutions | $25,340 | $123,200 |
$(-2,840.0)
(-72,900)
kWh
|
$(-620.0)
-
kW-mo/yr
|
- | - | - | $28,800 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,510 | $51,780 |
$24,580
606,300
kWh
|
$5,010
-
kW-mo/yr
|
- | - | $610 | $1,310 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,100 | $6,040 |
$1,720
44,200
kWh
|
$380
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $129,030 | $241,500 |
$23,460
577,600
kWh
|
$4,770
-
kW-mo/yr
|
$40,080
-
MMBtu
|
$30,000
-
gal
|
$610 | $30,110 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs