ITAC Assessment: MUCM38
ITAC logo
ITAC Assessment: MUCM38
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Research lab
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 50
Plant Area 66,302
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,173 1,615,247
kWh
Electricity Demand $38,485 5,673
kW-mo/yr
Electricity Fees $3,608 -
Other Gas $721 1
MMBtu
Other Energy $35,315 4,107
MMBtu
TOTAL YEARLY COSTS $156,302
RECOMMENDED SAVINGS* $27,254 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,213 $56,756 $17,971
374,401
kWh
$5,242
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,102 $752 $639
13,310
kWh
$463
-
kW-mo/yr
-
03 2.7243: Improve air circulation with destratification fans / other methods $963 $4,233 $(-58.4)
(-1,217)
kWh
$(-42.3)
-
kW-mo/yr
$1,064
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $724 - $557
11,597
kWh
$168
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $486 $272 $282
5,878
kWh
$204
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $376 $2,050 $315
6,570
kWh
$61
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $187 $100 $156
3,253
kWh
$31
-
kW-mo/yr
-
08 2.7134: Use photocell controls $120 $585 $100
2,093
kWh
$19
-
kW-mo/yr
-
09 2.2136: Install / repair insulation on steam lines $83 $114 - - $83
-
MMBtu
TOTAL RECOMMENDED $27,254 $64,862 $19,962
415,885
kWh
$6,145
-
kW-mo/yr
$1,146
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs