Assessment Year | 2002 |
---|---|
Principal Product | Dyed fabric |
NAICS |
n/a
|
SIC | 2258: Lace and Warp Knit Fabric Mills |
Sales Range | $10 M to 50M |
# of Employees | 72 |
Plant Area |
110,000
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $286,000 | 6,120,742 |
kWh
|
$0.047 |
Electricity Demand | $40,215 | 14,367 |
kW-mo/yr
|
$2.80 |
Electricity Fees | $52,048 | - |
|
- |
Natural Gas | $412,048 | 91,313 |
MMBtu
|
$4.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $280,156 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7272: Install heat pipes / raise cooling setpoint | $236,267 | $271,000 |
$28,437
628,993
kWh
|
- | $9,708 | - | $42,000 | $156,122 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,022 | $38,355 |
$13,835
306,011
kWh
|
$1,949
-
kW-mo/yr
|
$5,238 | - | - | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $12,081 | $35,838 | - | - | - |
$12,081
-
MMBtu
|
- | - | |
04 | 2.7135: Install occupancy sensors | $5,071 | $799 |
$3,780
83,614
kWh
|
- | $1,291 | - | - | - | |
05 | 2.7261: Install timers and/or thermostats | $1,593 | $591 |
$1,187
26,264
kWh
|
- | $406 | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,555 | $3,249 |
$1,159
25,647
kWh
|
- | $396 | - | - | - | |
07 | 2.2511: Insulate bare equipment | $1,276 | $1,003 | - | - | - |
$1,276
-
MMBtu
|
- | - | |
08 | 2.2511: Insulate bare equipment | $529 | $354 | - | - | - |
$529
-
MMBtu
|
- | - | |
09 | 2.7122: Disconnect ballasts | $431 | $510 |
$298
6,597
kWh
|
$25
-
kW-mo/yr
|
$108 | - | - | - | |
10 | 2.4239: Eliminate or reduce compressed air usage | $249 | $155 |
$186
4,110
kWh
|
- | $63 | - | - | - | |
11 | 2.2135: Repair and eliminate steam leaks | $82 | $60 | - | - | - |
$82
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $280,156 | $351,914 |
$48,882
1,081,236
kWh
|
$1,974
-
kW-mo/yr
|
$17,210 |
$13,968
-
MMBtu
|
$42,000 | $156,122 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs