ITAC Assessment: MS0217
ITAC logo
ITAC Assessment: MS0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Dyed fabric
NAICS
n/a
SIC 2258: Lace and Warp Knit Fabric Mills
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 110,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,000 6,120,742
kWh
Electricity Demand $40,215 14,367
kW-mo/yr
Electricity Fees $52,048 -
Natural Gas $412,048 91,313
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.7272: Install heat pipes / raise cooling setpoint $236,267 $271,000 $28,437
628,993
kWh
- $9,708 - $42,000 $156,122
02 2.7142: Utilize higher efficiency lamps and/or ballasts $21,022 $38,355 $13,835
306,011
kWh
$1,949
-
kW-mo/yr
$5,238 - - -
03 2.2414: Use waste heat from hot flue gases to preheat $12,081 $35,838 - - - $12,081
-
MMBtu
- -
04 2.7135: Install occupancy sensors $5,071 $799 $3,780
83,614
kWh
- $1,291 - - -
05 2.7261: Install timers and/or thermostats $1,593 $591 $1,187
26,264
kWh
- $406 - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,555 $3,249 $1,159
25,647
kWh
- $396 - - -
07 2.2511: Insulate bare equipment $1,276 $1,003 - - - $1,276
-
MMBtu
- -
08 2.2511: Insulate bare equipment $529 $354 - - - $529
-
MMBtu
- -
09 2.7122: Disconnect ballasts $431 $510 $298
6,597
kWh
$25
-
kW-mo/yr
$108 - - -
10 2.4239: Eliminate or reduce compressed air usage $249 $155 $186
4,110
kWh
- $63 - - -
11 2.2135: Repair and eliminate steam leaks $82 $60 - - - $82
-
MMBtu
- -
TOTAL RECOMMENDED $280,156 $351,914 $48,882
1,081,236
kWh
$1,974
-
kW-mo/yr
$17,210 $13,968
-
MMBtu
$42,000 $156,122
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs