42
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Materials recovery facilities | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0250 #06 Y:2024 | 06 | 2024 | Turn off equipment during breaks, reduce operating time | $6,753 | $5,720 |
n/a
|
UU0250 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $6,806 | $13,208 |
n/a
|
UU0250 #04 Y:2024 | 04 | 2024 | Eliminate or reduce compressed air usage | $8,795 | $5,760 |
n/a
|
UU0250 #03 Y:2024 | 03 | 2024 | Burn a less expensive grade of fuel | $11,024 | $16,000 |
n/a
|
UU0250 #02 Y:2024 | 02 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $18,742 | $49,723 |
n/a
|
UU0250 #01 Y:2024 | 01 | 2024 | Optimize plant power factor | $42,332 | $60,420 |
n/a
|
MU0017 #05 Y:2022 | 05 | 2022 | Close holes and openings in building such as broken windows | $719 | $75 | |
MU0017 #04 Y:2022 | 04 | 2022 | Utilize higher efficiency lamps and/or ballasts | $364 | $555 | |
MU0017 #03 Y:2022 | 03 | 2022 | Reduce illumination to minimum necessary levels | $31 | - | |
MU0017 #02 Y:2022 | 02 | 2022 | Turn off equipment when not in use | $2,860 | - | |
MU0017 #01 Y:2022 | 01 | 2022 | Turn off equipment when not in use | $106 | $240 | |
AM0849 #11 Y:2022 | 11 | 2022 | Use solar heat to make electricty | $71,703 | $867,640 | |
AM0849 #10 Y:2022 | 10 | 2022 | Reduce the pressure of compressed air to the minimum required | $362 | $30 | |
AM0849 #09 Y:2022 | 09 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,245 | $1,000 | |
AM0849 #08 Y:2022 | 08 | 2022 | Utilize higher efficiency lamps and/or ballasts | $535 | $830 | |
AM0849 #07 Y:2022 | 07 | 2022 | Repair or replace steam traps | $6,765 | $560 | |
AM0849 #06 Y:2022 | 06 | 2022 | Pay utility bills on time | $344 | - | |
AM0849 #05 Y:2022 | 05 | 2022 | Install occupancy sensors | $3,395 | $1,530 | |
AM0849 #04 Y:2022 | 04 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $18,625 | $37,000 | |
AM0849 #03 Y:2022 | 03 | 2022 | Adopt in-house material generation | $15,440 | $21,500 |