ITAC Assessment: MU0017
ITAC logo
ITAC Assessment: MU0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Material and Municipal Waste
NAICS 562920: Materials Recovery Facilities
SIC 8999: Services, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 40
Plant Area 35,000
ft2
Annual Production 18,000
ton
Production Hrs. Annual 2,340
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,693 703,240
kWh
Electricity Demand $23,371 2,373
kW-mo/yr
Electricity Fees $73,249 -
TOTAL YEARLY COSTS $141,313
RECOMMENDED SAVINGS* $4,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
01 2.6218: Turn off equipment when not in use $106 $240 $86
1,413
kWh
$20
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $2,860 - - - $2,860
-
gal
03 2.7111: Reduce illumination to minimum necessary levels $31 - $25
416
kWh
$6
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $364 $555 $297
4,946
kWh
$67
-
kW-mo/yr
-
05 2.7444: Close holes and openings in building such as broken windows $719 $75 $587
9,778
kWh
$132
-
kW-mo/yr
-
TOTAL RECOMMENDED $4,080 $870 $995
16,553
kWh
$225
-
kW-mo/yr
$2,860
-
gal
TOTAL IMPLEMENTED $3,943 $630 $884
14,724
kWh
$199
-
kW-mo/yr
$2,860
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs