Assessment Year | 1995 |
---|---|
Principal Product | Milk Products |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 217 |
Plant Area |
140,000
ft2
|
Annual Production | 100,000
Tgal
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $785,985 | 13,257,913 |
kWh
|
$0.059 |
Fuel Oil #6 | $534,197 | 213,453 |
MMBtu
|
$2.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,540 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,312 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $14,462 | $33,805 |
$14,462
239,449
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,290 | - |
$1,290
19,930
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,179 | $7,217 |
$14,179
254,689
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,061 | $2,352 |
$6,061
108,734
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $185 | $245 |
$185
3,224
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,643 | $1,195 | - |
$3,643
-
MMBtu
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,671 | $1,259 |
$1,671
29,894
kWh
|
- | - | |
08 | 3.4156: Use flow control valves on equipment to optimize water use | $5,049 | $700 | - | - |
$5,049
-
Tgal
|
|
TOTAL RECOMMENDED | $46,540 | $46,773 |
$37,848
655,920
kWh
|
$3,643
-
MMBtu
|
$5,049
-
Tgal
|
||
TOTAL IMPLEMENTED | $27,312 | $38,856 |
$23,669
401,231
kWh
|
$3,643
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs