ITAC Assessment: MO0159
ITAC logo
ITAC Assessment: MO0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Milk Products
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 217
Plant Area 140,000
ft2
Annual Production 100,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $785,985 13,257,913
kWh
Fuel Oil #6 $534,197 213,453
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $14,462 $33,805 $14,462
239,449
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,290 - $1,290
19,930
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,179 $7,217 $14,179
254,689
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,061 $2,352 $6,061
108,734
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $185 $245 $185
3,224
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $3,643 $1,195 - $3,643
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $1,671 $1,259 $1,671
29,894
kWh
- -
08 3.4156: Use flow control valves on equipment to optimize water use $5,049 $700 - - $5,049
-
Tgal
TOTAL RECOMMENDED $46,540 $46,773 $37,848
655,920
kWh
$3,643
-
MMBtu
$5,049
-
Tgal
TOTAL IMPLEMENTED $27,312 $38,856 $23,669
401,231
kWh
$3,643
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs