| Assessment Year | 2024 |
|---|---|
| Principal Product | Recycled Tires |
| NAICS | 562920: Materials Recovery Facilities |
| SIC | 4953: Refuse Systems |
| Sales Range | less than $500 k |
| # of Employees | 50 |
| Plant Area |
38,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $275,542 | 7,642,942 |
kWh
|
$0.036 | |
| Electricity Demand | $410,411 | 29,793 |
kW-mo/yr
|
$13.78 | |
| Electricity Fees | $276,110 | - |
|
- | |
| Natural Gas | $26,723 | 2,220 |
MMBtu
|
$12.04 | |
| Waste Disposal Costs | |||||
| Water Usage | $13,451 | 1,370 |
Tgal
|
$9.82 | |
| TOTAL YEARLY COSTS | $1,002,237 | ||||
| RECOMMENDED SAVINGS* | $94,452 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $75,710 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $42,332 | $60,420 | - | - | $42,332 | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,742 | $49,723 |
$18,742
520,614
kWh
|
- | - | |
| 03 | 2.1331: Burn a less expensive grade of fuel | $11,024 | $16,000 | - | - | $11,024 | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $8,795 | $5,760 |
$8,795
244,304
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,806 | $13,208 |
$3,142
87,279
kWh
|
$3,239
-
kW-mo/yr
|
$425 | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,753 | $5,720 |
$6,753
187,611
kWh
|
- | - | |
| TOTAL RECOMMENDED | $94,452 | $150,831 |
$37,432
1,039,808
kWh
|
$3,239
-
kW-mo/yr
|
$53,781 | ||
| TOTAL IMPLEMENTED | $75,710 | $101,108 |
$18,690
519,194
kWh
|
$3,239
-
kW-mo/yr
|
$53,781 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs