ITAC Assessment: LL0149
ITAC logo
ITAC Assessment: LL0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Wellhead equipment
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 30,000
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 3,744
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,556 554,960
kWh
Electricity Fees $1,252 -
Natural Gas $7,953 869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,643

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $1,932 $1,499 - - $1,932
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,591 $210 $1,530
23,799
kWh
$61 - -
03 2.7111: Reduce illumination to minimum necessary levels $1,237 - $1,189
18,495
kWh
$48 - -
04 2.7145: Install skylights $1,206 $1,660 $1,160
18,042
kWh
$46 - -
05 4.611: Begin a practice of predictive / preventative maintenance $1,505 $2,255 - - - $1,505
TOTAL RECOMMENDED $7,471 $5,624 $3,879
60,336
kWh
$155 $1,932
-
MMBtu
$1,505
TOTAL IMPLEMENTED $4,643 $5,414 $1,160
18,042
kWh
$46 $1,932
-
MMBtu
$1,505
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs