62
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MUCM41 #07 Y:2026 | 07 | 2026 | Maintain machines to reduce leaks | $572 | $19 |
n/a
|
| MUCM41 #06 Y:2026 | 06 | 2026 | Utilize sensors controlling roof and wall openings | $4,966 | $1,875 |
n/a
|
| MUCM41 #05 Y:2026 | 05 | 2026 | Reduce ventilation air | $585 | - |
n/a
|
| MUCM41 #04 Y:2026 | 04 | 2026 | Reduce illumination to minimum necessary levels | $50 | - |
n/a
|
| MUCM41 #03 Y:2026 | 03 | 2026 | Utilize controls to operate equipment only when needed | $64 | - |
n/a
|
| MUCM41 #02 Y:2026 | 02 | 2026 | Install vinyl strip / high speed / air curtain doors | $7,806 | $19,925 |
n/a
|
| MUCM41 #01 Y:2026 | 01 | 2026 | Install timers and/or thermostats | $9,797 | $969 |
n/a
|
| IP0183 #04 Y:2023 | 04 | 2023 | Optimize plant power factor | $71,584 | $212,913 | |
| IP0183 #03 Y:2023 | 03 | 2023 | Use radiant heater for spot heating | $8,695 | $19,367 | |
| IP0183 #02 Y:2023 | 02 | 2023 | Increase amount of condensate returned | $48,374 | $55,000 | |
| IP0183 #01 Y:2023 | 01 | 2023 | Utilize higher efficiency lamps and/or ballasts | $43,443 | $37,653 | |
| MZ0322 #02 Y:2021 | 02 | 2021 | Install equipment (eg compactor) to reduce disposal costs | $61,530 | $226,000 | |
| MZ0322 #01 Y:2021 | 01 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $23,809 | $9,182 | |
| MZ0304 #04 Y:2021 | 04 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $466 | $250 | |
| MZ0304 #03 Y:2021 | 03 | 2021 | Change rate schedules or other changes in utility service | $22,541 | - | |
| MZ0304 #02 Y:2021 | 02 | 2021 | Use solar heat to make electricty | $16,323 | $185,555 | |
| MZ0304 #01 Y:2021 | 01 | 2021 | Use existing dam to generate electricity | $83,325 | $120,377 | |
| UU0182 #06 Y:2021 | 06 | 2021 | Utilize controls to operate equipment only when needed | $4,360 | $920 | |
| UU0182 #05 Y:2021 | 05 | 2021 | Insulate bare equipment | $5,611 | $2,229 | |
| UU0182 #04 Y:2021 | 04 | 2021 | Add equipment/ operators to reduce production bottleneck | $69,301 | $172,000 |